Deerpark , Carrick-on-Suir , Co. Tipperary
- 15 Dec 2021Received
- 16 Feb 2022Conditional
- 22 Mar 2022Final grant
- 21 Mar 2032Permission expires
- Status
- Granted with conditions
- Decision
- Conditional · 16 Feb 2022
- Council
- Tipperary County Council
- Type
- PERMISSION
- Site
- 9.24 ha
What’s proposed
alterations to the previously granted solar farm (Tipperary County Council Reg Ref 17600928) Permission was originally granted for a solar photovoltaic installation comprising arrays of approximately 13,770 solar PV panels on ground mounted frames no taller than 2.8m; 2 no. inverter/transformer container units; a battery storage container unit; a 20kV on-site substation; landscaping, fencing and CCTV cameeras around the solar PV arrays and connecting to the off-site Deerpark ESB substation; provision of a temporary construction compound; widening of the existing farm entrance and internal tracks; and all ancillary works on a site of 9.12 ha. Permission is now sought for the following: optimised solar pv panel configuration to comprise up to 23,581 m" of solar panels on ground mounted frames; increase in height to the permitted solar panels from 2.72m to 2.82m and; Permission for an operational period of the solar farm from 35 years. Planning Permission is sought for a period of 10 years
211819 is a planning application to Tipperary County Council for alterations to the previously granted solar farm (Tipperary County Council Reg Ref, received on 15 Dec 2021; permission was granted with conditions on 16 Feb 2022.
Planning details
- Reference
- 211819
- Local authority
- Tipperary County Council
- Status
- Granted with conditions · register status “APPLICATION FINALISED”
- Received
- 15 Dec 2021
- Observations close
- 28 Jan 2022 (closed 1694 days ago)
- Decision due
- 17 Feb 2022 · decided 16 Feb 2022
- Decision
- Conditional on 16 Feb 2022
- Proposed development
- alterations to the previously granted solar farm (Tipperary County Council Reg Ref 17600928) Permission was originally granted for a solar photovoltaic installation comprising arrays of approximately 13,770 solar PV panels on ground mounted frames no taller than 2.8m; 2 no. inverter/transformer container units; a battery storage container unit; a 20kV on-site substation; landscaping, fencing and CCTV cameeras around the solar PV arrays and connecting to the off-site Deerpark ESB substation; provision of a temporary construction compound; widening of the existing farm entrance and internal tracks; and all ancillary works on a site of 9.12 ha. Permission is now sought for the following: optimised solar pv panel configuration to comprise up to 23,581 m" of solar panels on ground mounted frames; increase in height to the permitted solar panels from 2.72m to 2.82m and; Permission for an operational period of the solar farm from 35 years. Planning Permission is sought for a period of 10 yearsAs published by the register.
- Site area
- 9.24 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Full planning report for 52.35529, -7.43512
Zoning, appeals, sold prices, flood and heritage — the whole area in one PDF.
No account, no payment. Not a statutory planning search.
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 467828). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/211819/0.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |