Monaraha, Cahir
Approved in May 2022. No sign of building yet.
- 23 Feb 2022Received
- 13 Apr 2022Conditional
- 17 May 2022Final approval
- 16 May 2027Approval runs out
Planning details
- Status
- Approved
- Decision
- Conditional · 13 Apr 2022
- Reference
- 22152
- Received
- 23 Feb 2022
- Site
- 33.85 ha
What’s proposed
To amend the solar farm permitted on the site under Tipperary County Council Reg. Ref. 20/46 and consists of a revised solar PV panel arrangement resulting in an increase in the overall panel footprint extent; a reconfigured internal – access route network resulting in a decrease to the overall network length; the reduction in the number of transformer stations from 16 No. to 5 No. and the provision of string inverters to the rear of panel arrays. It is also proposed to reduce the previously permitted maximum export capacity to 19 MW
3 other applications within 500 m in five years
Open the free reportNearby 3 · 500 m · 5 years
Homes nearby
Protections nearby 250 m
- Recorded monument · 7
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 18 Sept 2026, 15:44 | open |
Summary
22152 is a planning application to Tipperary County Council for to amend the solar farm permitted on the site under Tipperary County Council Reg. Ref., received on 23 Feb 2022; permission was granted with conditions on 13 Apr 2022.