Loughlohery, Cahir, Co. Tipperary
Approved in Apr 2022. No sign of building yet.
Start notices are matched from the national building control register; a start on site can be missed.
- 21 Jan 2022Received
- 3 Mar 2022Conditional
- 6 Apr 2022Final approval
- 5 Apr 2027Approval runs out
Planning details
- Status
- Approved
- Decision
- Conditional · 3 Mar 2022
- Reference
- 2253
- Received
- 21 Jan 2022
- Site
- 13.23 ha
What’s proposed
Alterations to the previously granted solar farm (Tipperary County Council Reg Ref 16600465 as amended by Tipperary County Council Reg Ref P19600119). Permission was originally granted for a solar photovoltaic installation comprising up to 32,000 m2 of solar panels on ground mounted frames, 4 no. inverters in 2 blocks, 1 no. kV substation, fencing, access track, CCTV and all associated ancillary development works and…
Show all
services. Permission was subsequently granted for the addition of 3 no. battery storage containers and extension to the operational period of the solar farm from 25 years to 30 years under Tipperary County Council Reg Ref. 19600119 and An Bord Pleanala Ref. ABP-305222-19. Permission is now sought for the following: increase the area of solar panels from up to 32,000 m2 to up to 37,641 m2, increase in height to the permitted solar panels from 2.72m to 2.82m and Permission to increase the operational period of the solar farm from 30 years to 35 years
3 other applications within 500 m in five years
Open the reportNearby 3 · 500 m · 5 years
Protections nearby 250 m
- Recorded monument · 7
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 18 Sept 2026, 15:44 | open |
Summary
2253 is a planning application to Tipperary County Council for alterations to the previously granted solar farm (Tipperary County Council Reg Ref, received on 21 Jan 2022; permission was granted with conditions on 3 Mar 2022.