Ballydine, Kilsheelan, Co. Tipperary
Approved in Nov 2023.
- 13 Jul 2023Received
- 10 Nov 2023Conditional
- 14 Dec 2023Final approval
- 13 Dec 2028Approval runs out
- Status
- Approved
- Decision
- Conditional · 10 Nov 2023
- Council
- Tipperary County Council
- Type
- RETENTION
- Site
- 9,302 m²
What’s proposed
the existing temporary carpark (contractor carpark facility) and associated existing service roadway and existing compound area, comprising a mix of existing stone base and also tarmac surface treatment, and including existing site lighting installations, existing fencing, existing smoking shelter and existing bicycle rack. We also wish to apply for permission to extend the existing carpark by circa 2m to the east to accommodate the construction of 178 no permanent carparking spaces (which includes for the designation of 17 no. new e-car charging carparking spaces and 1 no. new combined disabled/e-car charging carparking space), upgrade of the existing surface finish to a tarmac finish as applicable throughout, installation of line markings and kerbing, drainage works including the installation of a petrol/oil interceptor and attenuation system, adaption of existing site lighting as required ( including the replacement of all existing site lighting fixtures), the alterations of existing tree line, adaptation of existing compound area to form a secure delivery drop-off/short-term storage area, and all necessary alterations to accommodate the above works, complete with all associated site works and ancillary accommodation. The planning application is accompanied by a Natura Impact Statement (NIS). This application refers to a development on a site that carries out activity for which an industrial Emissions Licence under Part IV of the Environmental Protection Agency Act 1992 (as amended) is required and where the major accident directive applies
Planning details
- Reference
- 23196
- Local authority
- Tipperary County Council
- Status
- Granted with conditions · register status “APPLICATION FINALISED”
- Received
- 13 Jul 2023
- Decision due
- 13 Nov 2023 · decided 10 Nov 2023
- Decision
- Conditional on 10 Nov 2023
- Site area
- 9,302 m² from the mapped boundary, not the council's figure
Nearby 1 · 500 m · 12 months
- CommencedMSD Ireland (Ballydine) , Ballydine Kilsheelan Clonmel , Co. Tipperary
- CommencedMSD Ireland (Ballydine) , Ballydine Kilsheelan Clonmel , Co. Tipperary
- CommencedMSD Ireland (Ballydine) , Ballydine , Kilsheelan Clonmel Co. Tipperary
- CommencedBallydine , Kilsheelan , Co. Tipperary
- WithdrawnBallydine , Kilsheelan , Co. Tipperary
- GrantedBallydine , Kilsheelan , Clonmel
Protections nearby 250 m
- Recorded monument · 5
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 18 Sept 2026, 15:44 | open |
Summary
23196 is a planning application to Tipperary County Council for the existing temporary carpark (contractor carpark facility) and associated existing, received on 13 Jul 2023; permission was granted with conditions on 10 Nov 2023.