Farranrory Upper Farranrory Lower Coolnashinnagh & Gortnasmuttaun , Ballingarry , Co. Tipperary
- 6 Oct 2023Received
- 28 Nov 2023Conditional
- 10 Jan 2024Final grant
- 29 Mar 2026Permission expires
- Status
- Granted with conditions
- Decision
- Conditional · 28 Nov 2023
- Council
- Tipperary County Council
- Type
- PERMISSION
- Site
- 61.55 ha
What’s proposed
an amendment to the planning application previously granted permission under planning reference 20/972. The previously consented planning application included the construction of 9 turbines with maximum overall ground to blade tip height of up to 150 metres, associated foundations and hardstand areas; new site entrances, upgrade of existing site entrances; new on-site 38KV substation and all ancillary site works. The proposed amendments to the previously consented application comprise: (1) Increase the tip height of the turbines from 150 to 156.5 metres and increase the rotor diameter from 133 to 136 metres (3) Reconfiguration of a number of the consented hardstand layouts and associated changes to internal access roads (4) Minor Adjustments to the red line boundary (5) Provision of LiDAR (This application is accompanied by a NIS)
2360803 is a planning application to Tipperary County Council for an amendment to the planning application previously granted permission under planning, received on 6 Oct 2023; permission was granted with conditions on 28 Nov 2023.
Planning details
- Reference
- 2360803
- Local authority
- Tipperary County Council
- Status
- Granted with conditions · register status “APPLICATION FINALISED”
- Received
- 6 Oct 2023
- Observations close
- 10 Nov 2023 (closed 1044 days ago)
- Decision due
- 30 Nov 2023 · decided 28 Nov 2023
- Decision
- Conditional on 28 Nov 2023
- Proposed development
- an amendment to the planning application previously granted permission under planning reference 20/972. The previously consented planning application included the construction of 9 turbines with maximum overall ground to blade tip height of up to 150 metres, associated foundations and hardstand areas; new site entrances, upgrade of existing site entrances; new on-site 38KV substation and all ancillary site works. The proposed amendments to the previously consented application comprise: (1) Increase the tip height of the turbines from 150 to 156.5 metres and increase the rotor diameter from 133 to 136 metres (3) Reconfiguration of a number of the consented hardstand layouts and associated changes to internal access roads (4) Minor Adjustments to the red line boundary (5) Provision of LiDAR (This application is accompanied by a NIS)As published by the register.
- Site area
- 61.55 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 2 applications within 500 m in the last 5 years
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 471542). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/2360803/0.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |