Derryville Moyne , Thurles , Co. Tipperary
- 22 Dec 2023Received
- 3 Oct 2024Conditional
- 6 Nov 2024Final grant
- 27 Oct 2025Commenced
- 5 Nov 2029Permission expires
- Status
- Commenced
- Decision
- Conditional · 3 Oct 2024
- Council
- Tipperary County Council
- Type
- PERMISSION
- Site
- 2.44 ha
What’s proposed
the construction of an 1,800 sq.m sludge holding building of c. 60m in length, 30m in width and 13.5m in height, to incorporate an open faced biofilter to be installed at the western end of the facility building, for the acceptance and temporary storage of up to 12,000 tonnes per annum of sludges produced from wastewater treatment; internal site roads and parking; a 50 sq.m welfare/office facility of c. 10m in length, 5m in width and 5m in height; 1 no. surface mounted weighbridge; an electrical sub-station of c. 7.5m in length, 4.3 m in width and 3.2 m in height; underground holding tanks, infiltration areas and associated drainage pipework; pumphouse of c. 2.5m in width, 2.5 m in length and 2.8m in height; permeable and impermeable hardstanding; entrance gate and fencing and perimeter landscaping. An Environmental Impact Assessment Report has been submitted as a part of this application
2361035 is a planning application to Tipperary County Council for the construction of an 1,800 sq.m sludge holding building of c. 60m in length, 30m in, received on 22 Dec 2023; permission was granted with conditions on 3 Oct 2024.
Planning details
- Reference
- 2361035
- Local authority
- Tipperary County Council
- Status
- Commenced · register status “APPLICATION FINALISED”
- Received
- 22 Dec 2023
- Observations close
- 6 Feb 2024 (closed 963 days ago)
- Decision due
- 3 Oct 2024 · decided 3 Oct 2024
- Decision
- Conditional on 3 Oct 2024
- Proposed development
- the construction of an 1,800 sq.m sludge holding building of c. 60m in length, 30m in width and 13.5m in height, to incorporate an open faced biofilter to be installed at the western end of the facility building, for the acceptance and temporary storage of up to 12,000 tonnes per annum of sludges produced from wastewater treatment; internal site roads and parking; a 50 sq.m welfare/office facility of c. 10m in length, 5m in width and 5m in height; 1 no. surface mounted weighbridge; an electrical sub-station of c. 7.5m in length, 4.3 m in width and 3.2 m in height; underground holding tanks, infiltration areas and associated drainage pipework; pumphouse of c. 2.5m in width, 2.5 m in length and 2.8m in height; permeable and impermeable hardstanding; entrance gate and fencing and perimeter landscaping. An Environmental Impact Assessment Report has been submitted as a part of this applicationAs published by the register.
- Site area
- 2.44 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby nothing else within 500 m in the last 5 years
No other application within 500 m in the last 5 years.
Appeal
Not appealed.
Commencement
- Seven day notice SN0013275TT
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 22 Sept 2026, 16:10 (store id 472519). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/2361035/0.
Source: npad · fetched 22 Sept 2026, 16:10
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 22 Sept 2026, 16:10 | open |