Townlands of Kerane Fawnlough and Ballynaclough, Nenagh, Co. Tipperary
- 7 Feb 2024Received
- 20 Aug 2024Conditional
- 23 Sept 2024Final grant
- 22 Sept 2029Permission expires
- Status
- Granted with conditions
- Decision
- Conditional · 20 Aug 2024
- Council
- Tipperary County Council
- Type
- PERMISSION
- Site
- 87.18 ha
What’s proposed
a 10-year planning permission to construct and complete a solar PV Energy Development with a total site area of c. 88.5 hectares comprising of solar PV ground mounted on support structures, inverter substations, 38kV substation, watercourse crossings, temporary construction compounds, internal access tracks (new, upgrading existing and existing), security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure. The development also comprises a protected structure ‘S694 – Stone piers and cast iron gates with carriage stone’. This structure is at the entrance to the former Debsborough House and no works are required to the structure. Realignment of 35m of wall, re-location of a telegraph pole and vegetation trimming are required to achieve the northern visibility splay. The solar farm would be operational for 40 years
2460074 is a planning application to Tipperary County Council for a 10-year planning permission to construct and complete a solar PV Energy Development, received on 7 Feb 2024; permission was granted with conditions on 20 Aug 2024.
Planning details
- Reference
- 2460074
- Local authority
- Tipperary County Council
- Status
- Granted with conditions · register status “APPLICATION FINALISED”
- Received
- 7 Feb 2024
- Observations close
- 13 Mar 2024 (closed 933 days ago)
- Decision due
- 20 Aug 2024 · decided 20 Aug 2024
- Decision
- Conditional on 20 Aug 2024
- Proposed development
- a 10-year planning permission to construct and complete a solar PV Energy Development with a total site area of c. 88.5 hectares comprising of solar PV ground mounted on support structures, inverter substations, 38kV substation, watercourse crossings, temporary construction compounds, internal access tracks (new, upgrading existing and existing), security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure. The development also comprises a protected structure ‘S694 – Stone piers and cast iron gates with carriage stone’. This structure is at the entrance to the former Debsborough House and no works are required to the structure. Realignment of 35m of wall, re-location of a telegraph pole and vegetation trimming are required to achieve the northern visibility splay. The solar farm would be operational for 40 yearsAs published by the register.
- Site area
- 87.18 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 2 applications within 500 m in the last 5 years
Homes nearby
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
- NIAH-recorded building · 4
- Recorded monument · 19
Provenance
Register row from the national planning applications feed (NPAD), fetched 30 Sept 2026, 23:22 (store id 471281). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/2460074/0.
Source: npad · fetched 30 Sept 2026, 23:22
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 30 Sept 2026, 23:22 | open |