Castleiney Village, Templemore, Co. Tipperary
Approved in Jul 2024. No sign of building yet.
Start notices are matched from the national building control register; a start on site can be missed.
- 3 May 2024Received
- 20 Jun 2024Conditional
- 24 Jul 2024Final approval
- 23 Jul 2029Approval runs out
Planning details
- Status
- Approved
- Decision
- Conditional · 20 Jun 2024
- Reference
- 2460341
- Received
- 3 May 2024
- Site
- 162 m²
What’s proposed
The renovation and upgrades to the existing Ball Alley which is a protected structure. The works include resurfacing of the floor, constructions of a concrete stub wall to the rear, installation of a glass wall to the rear and reinstatement of the netting to the existing structure
1 other application within 500 m in the last year
Open the reportNearby 1 · 500 m · 12 months
Homes nearby
Zoning
Reserved for the schools, creches, community and health facilities a neighbourhood needs.
Protections nearby 250 m
- NIAH-recorded building · 1
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 18 Sept 2026, 15:44 | open |
Summary
2460341 is a planning application to Tipperary County Council for the renovation and upgrades to the existing Ball Alley which is a protected structure., received on 3 May 2024; permission was granted with conditions on 20 Jun 2024.