Dew Valley Foods, Holycross Road Thurles, Co. Tipperary
Approved in Jan 2026. No sign of building yet.
- 18 Nov 2024Received
- 15 Dec 2025Conditional
- 27 Jan 2026Final approval
- 26 Jan 2036Approval runs out
- Status
- Approved
- Decision
- Conditional · 15 Dec 2025
- Council
- Tipperary County Council
- Type
- PERMISSION
- Site
- 12.16 ha
What’s proposed
a 10-year permission for the development which will consist of the phased extension of the existing food manufacturing facility comprising: 1) construction of an 11,267 m² extension to the existing food manufacturing facility, including: (a) cold storage areas; (b) two-storey office space, toilet block, and drivers’ area; (c) new processing, packing, intake/dispatch areas; (d) electrical plant, maintenance rooms, and external steel access staircases; (e) new gas tanks, transformer compound, and pipe bridge; 2) construction of an 1,500 m³ storage building for packaging and machinery; 3) extension of existing wastewater treatment plant (WWTP) buildings (primary: 107 m², secondary: 250 m²); 4) construction of an 110 m² waste collection building; 5) extension to the existing water treatment plant (WTP) building (70 m²); 6) expansion of the high temperature (HT) plant room (64 m²); 7) construction of 4 no. tanks; 8) installation of 3 no. bunded kerosene tanks (50,000 L each); 9) construction of a 16 m high boiler stack; 10) construction of new internal access roads (c. 8,825 m²); 11) creation of a 520 m² internal courtyard area; 12) construction of a 630 m² external storage compound; 13) construction of a 3,120 m³ stormwater attenuation pond and discharge line; 14) installation of a standby treated effluent discharge pipeline (1,490 m); 15) realignment and expansion of site boundary, including new boundary walls, fencing and planting; 16) provision of an additional 8 no. truck parking spaces; 17) relocation of the existing fuel tank and weighbridge; 18) expansion of the existing sprinkler pump house (24 m²); 19) conversion of 22 no. existing car spaces including 1 no. accessible space to 22 no. EV car spaces as required and provision of 30 no. bicycle parking spaces; 20) installation of new site lighting; 21) demolition of existing buildings and structures (total 1,840 m²); and 22) all ancillary site development works and services to facilitate the development including drainage, landscaping, temporary construction compound and utility connections. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) has been submitted to the planning authority with this application
Planning details
- Reference
- 2460987
- Local authority
- Tipperary County Council
- Status
- Granted with conditions · register status “APPLICATION FINALISED”
- Received
- 18 Nov 2024
- Observations close
- 23 Dec 2024 (closed 657 days ago)
- Decision due
- 16 Dec 2025 · decided 15 Dec 2025
- Decision
- Conditional on 15 Dec 2025
- Proposed development
- a 10-year permission for the development which will consist of the phased extension of the existing food manufacturing facility comprising: 1) construction of an 11,267 m² extension to the existing food manufacturing facility, including: (a) cold storage areas; (b) two-storey office space, toilet block, and drivers’ area; (c) new processing, packing, intake/dispatch areas; (d) electrical plant, maintenance rooms, and external steel access staircases; (e) new gas tanks, transformer compound, and pipe bridge; 2) construction of an 1,500 m³ storage building for packaging and machinery; 3) extension of existing wastewater treatment plant (WWTP) buildings (primary: 107 m², secondary: 250 m²); 4) construction of an 110 m² waste collection building; 5) extension to the existing water treatment plant (WTP) building (70 m²); 6) expansion of the high temperature (HT) plant room (64 m²); 7) construction of 4 no. tanks; 8) installation of 3 no. bunded kerosene tanks (50,000 L each); 9) construction of a 16 m high boiler stack; 10) construction of new internal access roads (c. 8,825 m²); 11) creation of a 520 m² internal courtyard area; 12) construction of a 630 m² external storage compound; 13) construction of a 3,120 m³ stormwater attenuation pond and discharge line; 14) installation of a standby treated effluent discharge pipeline (1,490 m); 15) realignment and expansion of site boundary, including new boundary walls, fencing and planting; 16) provision of an additional 8 no. truck parking spaces; 17) relocation of the existing fuel tank and weighbridge; 18) expansion of the existing sprinkler pump house (24 m²); 19) conversion of 22 no. existing car spaces including 1 no. accessible space to 22 no. EV car spaces as required and provision of 30 no. bicycle parking spaces; 20) installation of new site lighting; 21) demolition of existing buildings and structures (total 1,840 m²); and 22) all ancillary site development works and services to facilitate the development including drainage, landscaping, temporary construction compound and utility connections. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) has been submitted to the planning authority with this applicationAs published by the register.
- Site area
- 12.16 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 5 · 500 m · 5 years
Homes nearby
- For saleRushmere, Cabra Road, Thurles, Co. Tipperary, E41 EH76
- For sale6 Kennedy Park, Thurles, Co. Tipperary, E41 XE95
- For sale"Dromore", Cabra Road, Ballycurrane, Thurles, Co. Tipperary, E41 D370
- For sale233a Rosemount, Clongower, Thurles, Co. Tipperary, E41 HY82
- For sale7 Ashgrove, Monadreen, Thurles, Co. Tipperary, E41 X7X2
- For saleStradavoher, Thurles, Co. Tipperary, E41 KP30
- For sale23 Sarsfield Street, Thurles, Co. Tipperary, E41 P440
- For sale18 Croke Gardens, Thurles, Co. Tipperary, E41 A9Y8
- For sale82 Childers Park, Thurles, Co. Tipperary, E41 DR72
- For sale11 The Gasworks, Stradavoher, Thurles, Co. Tipperary, E41 X4W5
- For sale19 Derheen, Thurles, Co. Tipperary, E41 VP48
- For sale1 Stradavoher, Thurles, Co. Tipperary, E41 VE43
Zoning
Zoned for employment uses. Housing is not the intended use here.
Zoned for waterfront and harbour-related development.
Protections nearby 250 m
No mapped flood area nearby.
- NIAH-recorded building · 1
- Recorded monument · 3
Where this comes from
National planning feed (NPAD), fetched 7 Oct 2026, 01:19.
Source: npad · fetched 7 Oct 2026, 01:19
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 7 Oct 2026, 01:19 | open |
Summary
2460987 is a planning application to Tipperary County Council for a 10-year permission for the development which will consist of the phased extension of, received on 18 Nov 2024; permission was granted with conditions on 15 Dec 2025.