Boherbaun Capparoe , Nenagh , Co. Tipperary
- 12 Dec 2024Received
- 18 Mar 2025Conditional
- 21 Apr 2025Final grant
- 20 Apr 2030Permission expires
- Status
- Granted with conditions
- Decision
- Conditional · 18 Mar 2025
- Council
- Tipperary County Council
- Type
- PERMISSION
- Site
- 6,804 m²
What’s proposed
two-storey pitched roof extension to the rear of the existing dwelling, including three dormer windows at attic level. The attic level will contain three new bedrooms (two en-suite). The ground floor will feature a new kitchen, utility room, pantry, and sitting room. A single-storey pitched roof extension will link the existing dwelling to the new two-storey extension, incorporating a new hallway, a bathroom, and a disabled WC. The attic level will include two gable windows (one on each side). Installation of a new wastewater treatment system, including a septic tank and percolation area, along with a new soakaway
2461094 is a planning application to Tipperary County Council for two-storey pitched roof extension to the rear of the existing dwelling, including three, received on 12 Dec 2024; permission was granted with conditions on 18 Mar 2025.
Planning details
- Reference
- 2461094
- Local authority
- Tipperary County Council
- Status
- Granted with conditions · register status “APPLICATION FINALISED”
- Received
- 12 Dec 2024
- Observations close
- 27 Jan 2025 (closed 599 days ago)
- Decision due
- 26 Mar 2025 · decided 18 Mar 2025
- Decision
- Conditional on 18 Mar 2025
- Proposed development
- two-storey pitched roof extension to the rear of the existing dwelling, including three dormer windows at attic level. The attic level will contain three new bedrooms (two en-suite). The ground floor will feature a new kitchen, utility room, pantry, and sitting room. A single-storey pitched roof extension will link the existing dwelling to the new two-storey extension, incorporating a new hallway, a bathroom, and a disabled WC. The attic level will include two gable windows (one on each side). Installation of a new wastewater treatment system, including a septic tank and percolation area, along with a new soakawayAs published by the register.
- Site area
- 6,804 m² from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Full planning report for 52.80531, -8.26473
Zoning, appeals, sold prices, flood and heritage — the whole area in one PDF.
No account, no payment. Not a statutory planning search.
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 473786). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/2461094/0.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |