PlanningRegister.ie
Tipperary County Council · 25106

Kilcommon More North, Cahir, Co. Tipperary

Declared invalid.

  1. 10 Jun 2025Received
Status
Withdrawn or invalid
Decision
Not yet
Council
Tipperary County Council
Type
RETENTION
Site
1,217 m²

What’s proposed

a) the alterations and demolitions already carried out to the pre-existing structures on site, b) the removal of the signage to the front entrance, c) PLANNING PERMISSION for the change-of-use of the remaining existing structures on site from commercial to residential, d) permission for further alterations to the existing structures on site to provide two front facing flat roofed dormer windows, two front facing roof lights, three rear facing roof lights, raised site boundaries with the adjoining detached bungalow and the omission of the existing NE facing first floor facing window, e) permission for a single storey flat roofed side and front family room extension including an open pergola to the same side, f) permission to decommission the existing septic tank on site to provide a replacement EPA compliant waste water treatment system on site, g) permission for the widening of the splay to existing front vehicular entrance

Planning details

Reference
25106
Local authority
Tipperary County Council
Status
Withdrawn or invalid · register status “INCOMPLETED APPLICATION”
Received
10 Jun 2025
Decision
Not decided
Site area
1,217 m² from the mapped boundary, not the council's figure

Live near Kilcommon More North?

Everything else planned on your street, in one report.

Check my street
Council register ↗

Nearby 5 · 500 m · 12 months

Distance
Time

Explore this area on the map →

Homes nearby

Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

25106 is a planning application to Tipperary County Council for a) the alterations and demolitions already carried out to the pre-existing structures on, received on 10 Jun 2025; the file is recorded as incompleted application.