Bakery Weir , Barnora and Caherabbey Lower Townlands , Tipperary
- 12 Dec 2025Received
- 26 Jan 2026Observations closed
- Status
- Withdrawn or invalid
- Decision
- Not yet
- Council
- Tipperary County Council
- Type
- PERMISSION
- Site
- 100 m²
What’s proposed
development at Bakery Weir, located on the River Suir. The project site lies approximately 1.3km northeast of Cahir and is located adjacent to the R670 (Cashel Road). This application relates to a Registered Protected Structure (RPS No. TRPS1365). The development will consist of the partial removal of Bakery Weir and the non-functional fish pass to restore the natural river conditions and ecological connectivity of the River Suir, and all associated works, including: I. The partial removal of approximately two-thirds (70m) of Bakery Weir from the northern riverbank and protection of the remaining weir beside the mill wheel and tailrace for heritage purposes. II. The reprofiling and restoration of approximately 250m of the river channel to replicate natural stream conditions, enable fish migration, and create a low-flow channel. The construction of a new fill structure downstream to channel water flow into the proposed low-flow channels in the northern and southern branches of the river. Works to secure the banks of the river and to improve habitats, including placement of groynes from set stones, root trunks, rows of stakes and living fascines. III. Construction access to the weir is proposed on the R670 Cashel Road via the temporary upgrade of an existing informal pathway. Creation of a temporary access ramp from the southern bank of the river and the creation of a temporary driving platform to Bakery Weir. The removal of individual trees to enable construction activities. The creation of temporary construction lay down areas/site compounds adjacent to the R670 Cashel Road. IV. Reinstatement of the disturbed lands following partial weir removal including landscaping consisting of seeding and planting with appropriate native vegetation. The removal of temporary construction facilities. V. All associated and ancillary site development works. VI. This application is accompanied by a Natura Impact Statement
2561293 is a planning application to Tipperary County Council for development at Bakery Weir, located on the River Suir. The project site lies, received on 12 Dec 2025; the file is recorded as incompleted application.
Planning details
- Reference
- 2561293
- Local authority
- Tipperary County Council
- Status
- Withdrawn or invalid · register status “INCOMPLETED APPLICATION”
- Received
- 12 Dec 2025
- Observations close
- 26 Jan 2026 (closed 236 days ago)
- Decision due
- No due date published
- Decision
- Not decided
- Proposed development
- development at Bakery Weir, located on the River Suir. The project site lies approximately 1.3km northeast of Cahir and is located adjacent to the R670 (Cashel Road). This application relates to a Registered Protected Structure (RPS No. TRPS1365). The development will consist of the partial removal of Bakery Weir and the non-functional fish pass to restore the natural river conditions and ecological connectivity of the River Suir, and all associated works, including: I. The partial removal of approximately two-thirds (70m) of Bakery Weir from the northern riverbank and protection of the remaining weir beside the mill wheel and tailrace for heritage purposes. II. The reprofiling and restoration of approximately 250m of the river channel to replicate natural stream conditions, enable fish migration, and create a low-flow channel. The construction of a new fill structure downstream to channel water flow into the proposed low-flow channels in the northern and southern branches of the river. Works to secure the banks of the river and to improve habitats, including placement of groynes from set stones, root trunks, rows of stakes and living fascines. III. Construction access to the weir is proposed on the R670 Cashel Road via the temporary upgrade of an existing informal pathway. Creation of a temporary access ramp from the southern bank of the river and the creation of a temporary driving platform to Bakery Weir. The removal of individual trees to enable construction activities. The creation of temporary construction lay down areas/site compounds adjacent to the R670 Cashel Road. IV. Reinstatement of the disturbed lands following partial weir removal including landscaping consisting of seeding and planting with appropriate native vegetation. The removal of temporary construction facilities. V. All associated and ancillary site development works. VI. This application is accompanied by a Natura Impact StatementAs published by the register.
- Site area
- 100 m² from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 7 applications within 500 m in the last 5 years
- GrantedNo. 17 The Avenue Woodlands , Barnora Cahir , Co. Tipperary
- WithdrawnNo. 17 The Avenue Woodlands , Barnora Cahir , Co. Tipperary
- OpenBakery Weir , River Suir in the townlands of Barnora & Caherabbey Lower , Co. Tipperary
- GrantedColáiste Dún Iascaigh , Cashel Road , Cahir
- GrantedBarnora , Cashel Road , Cahir
- CommencedRosemount Farm Road , Barnora Cahir , Co. Tipperary
- GrantedCashel Road , Cahir , Co. Tipperary
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 476387). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/2561293/0.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |