PlanningRegister.ie
Tipperary County Council · 2660072

Within the townland of, Ballyboe, County Tipperary

Declared invalid.

  1. 29 Jan 2026Received
  2. 5 Mar 2026Observations closed
Status
Withdrawn or invalid
Decision
Not yet
Council
Tipperary County Council
Type
PERMISSION
Site
100 m²

What’s proposed

a RED III development for a period of 10 years for the construction of a solar PV energy development (renewable energy development) with a total site area of 32.6 hectares. The development will consist of PV panels mounted on metal frames, inverter station, string inverters, new access tracks, underground cabling, perimeter fencing with CCTV cameras and access gates, electrical cabling and ducting, new on-site ESB 38kV substation building, 33kV control building, lighting masts, laydown areas, landscaping and all ancillary grid infrastructure and associated works. The grid route is c. 1.06km in length. The Application Site will be accessed from two new access points off the R706, one of which was previously consented under Planning Reference: 19600239. The Proposed Development will connect with and represents an extension to the adjacent solar farm permitted under Planning Reference 19600239 and 21403. Permission is also sought for minor amendments to Planning Reference 19600239 and 21403 which comprises of (1) Minor adjustments to the perimeter fencing (length decreasing by c.1km), (2) Minor adjustments to the red line boundary (decreasing by c.1km), (3) Increase operational lifetime from 30 years to 40 years. The proposed solar farm will connect to the national grid via the new 38kV substation and will have an operational lifetime of 40 years. A Natura Impact Statement (NIS) has been prepared in respect of this application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

Planning details

Reference
2660072
Local authority
Tipperary County Council
Status
Withdrawn or invalid · register status “INCOMPLETED APPLICATION”
Received
29 Jan 2026
Observations close
5 Mar 2026 (closed 241 days ago)
Decision
Not decided
Site area
100 m² from the mapped boundary, not the council's figure

Live near Within the townland of?

Everything else planned on your street, in one report.

Check my street
Council register ↗

Nearby 1 · 500 m · 5 years

Distance
Time

Explore this area on the map →

Protections nearby 250 m

  • Recorded monument · 1
    R137918

Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

2660072 is a planning application to Tipperary County Council for a RED III development for a period of 10 years for the construction of a solar PV energy, received on 29 Jan 2026; the file is recorded as incompleted application.