PlanningRegister.ie
Tipperary County Council · 2660890

Fort Henry Business Park, Ballina, Co Tipperary

Decision due 5 Nov.

  1. 11 Sept 2026Received
  2. 16 Oct 2026Observations closed
  3. 5 Nov 2026Decision due
Status
With the council, no decision yet
Decision
Due 5 Nov 2026
Council
Tipperary County Council
Type
PERMISSION
Site
1.49 ha

Live near Fort Henry Business Park?

Everything else planned on your street, in one report.

Check my street
Council register ↗

One email to confirm. Unsubscribe in one click.

What’s proposed

(i) Works to the existing manufacturing production and administration building to include: (a) Construction of an extension building between the existing production and administration building and the existing warehouse building with associated ramp access, to provide for increased production and store space; (b) Provision of seven modular store units linked to; the existing production and administration building; and, the proposed extension for use ancillary to manufacturing activity; (c) Construction of goods lift to rear of the existing production and administration building; (d) Minor alterations to the existing car park layout to facilitate the proposed extension building; (ii) Works to the existing light industrial building (‘Unit 2’) to provide for; (a) extension to the rear of the building to provide for increased storage; and (b) modifications to north-west and south-west elevations of that building to provide for the replacement of roller door and pedestrian door openings; (iii) Provision of additional plant area with perimeter fencing; (iv) Provision of new surface water management infrastructure including collection of roof water and provision of on-site surface water storage with controlled discharge from that new storage to an existing surface water outfall via a proposed new headwall outlet; (v) Provision of new pedestrian gate access along roadside boundary; (vi) Proposed lighting within the site; and (vii) All associated site development works including the removal of existing temporary modular structures from the site; and 2. Retention Permission for the following works: (a) Erection of three flag poles at the entrance; and (b) Externally affixed signage on existing buildings

Planning details

Reference
2660890
Local authority
Tipperary County Council
Status
With the council, no decision yet · register status “NEW APPLICATION”
Received
11 Sept 2026
Observations close
16 Oct 2026 (closed 6 days ago)
Decision due
5 Nov 2026
Decision
Not decided
Site area
1.49 ha from the mapped boundary, not the council's figure

Nearby 10 · 500 m · 5 years

Show all 10

Explore this area on the map →

Homes nearby

Where this comes from

National planning feed (NPAD), fetched 22 Sept 2026, 16:10.

Source: National Planning Application Database · fetched 22 Sept 2026, 16:10
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.022 Sept 2026, 16:10open
Summary

2660890 is a planning application to Tipperary County Council for (i) Works to the existing manufacturing production and administration building to, received on 11 Sept 2026; a decision is due by 5 Nov 2026.