Lisbrien, Nenagh, Co. Tipperary
Declared invalid.
- 15 Sept 2026Received
- 20 Oct 2026Observations closed
- Status
- Withdrawn or invalid
- Decision
- Not yet
- Council
- Tipperary County Council
- Type
- PERMISSION
- Site
- 8.32 ha
What’s proposed
RED III the development and operation of a solar photovoltaic (PV) farm with a total site area of 6.9 hectares comprising of the following – i) construction and operation of 22,500 sqm. of solar PV arrays on ground-mounted metal frames, with a maximum overall height of 4.7 metres, ii) Internal underground trenching, electrical cabling and ducting between the solar PV arrays and electrical invertor units, iii) 4 no. electrical invertor units, iv) use and upgrading of 1 no. existing field access point for construction and operational access to the site.1 no. temporary laydown area, v) 2 no. control cabins, vi) 33kV connector cable network, joint bays and associated works, vii) Internal access track, drainage works, security fencing, CCTV, and all associated ancillary site development works, viii) The decommissioning of the solar farm and reinstatement of the site at the end of its operational life - the application seeks a 10-year permission with an operational lifetime of 40 years
Planning details
- Reference
- 2660902
- Local authority
- Tipperary County Council
- Status
- Withdrawn or invalid · register status “INCOMPLETED APPLICATION”
- Received
- 15 Sept 2026
- Observations close
- 20 Oct 2026 (closed 19 days ago)
- Decision
- Not decided
- Site area
- 8.32 ha from the mapped boundary, not the council's figure
Nearby 1 · 500 m · 12 months
Homes nearby
Protections nearby 250 m
- Recorded monument · 8
Where this comes from
National planning feed (NPAD), fetched 28 Oct 2026, 01:34.
Source: National Planning Application Database · fetched 28 Oct 2026, 01:34
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 28 Oct 2026, 01:34 | open |
Summary
2660902 is a planning application to Tipperary County Council for RED III the development and operation of a solar photovoltaic (PV) farm with a total, received on 15 Sept 2026; the file is recorded as incompleted application.