Graiguenageeha & Rathnaskilloge, Decies-without-Drum, Co. Waterford
Declared invalid.
- 29 Jan 2026Received
- 5 Mar 2026Observations closed
Planning details
- Status
- Withdrawn or invalid
- Reference
- 2660051
- Received
- 29 Jan 2026
- Site
- 4.42 ha
What’s proposed
The development will consist of a 10-year permission for the construction of an energy storage facility (i.e. a co-located energy storage development as per the Renewable Energy Directive III) within a total site area of approximately 4.16 hA, to include one IPP modular control building on concrete plinths with a maximum height of 4.63m and associated electrical compound, 180 containerised battery storage modules on…
Show all
concrete support structures with a maximum height of 4.2m, 30 electrical transformer / inverter stations on concrete supports, associated electrical ducting / cabling, security fencing and CCTV security monitoring system, storage containers, lightning protection poles and ancillary equipment. The development will also include the demolition of an existing unfinished dwelling structure. This development is covered by the provision of the Renewable Energy Directive III(Directive (EU) 2023/2413 )
5 other applications within 500 m in five years
Open the reportNearby 5 · 500 m · 5 years
Homes nearby
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 18 Sept 2026, 15:44 | open |
Summary
2660051 is a planning application to Waterford City and County Council for the development will consist of a 10-year permission for the construction of an energy, received on 29 Jan 2026; the file is recorded as incompleted application.