PlanningRegister.ie
Westmeath County Council · 21187

St Finians College, Longford Road, Irishtown

Approved in Nov 2021. Built and signed off.

  1. 13 Apr 2021Received
  2. 13 Oct 2021Conditional
  3. 24 Nov 2021Final approval
  4. 21 Nov 2023Building started
  5. 15 Apr 2025Signed off
Status
Building started
Decision
Conditional · 13 Oct 2021
Council
Westmeath County Council
Type
PERMISSION
Units
1
Site
15.24 ha

Live near St Finians College?

Everything else planned on your street, in one report.

Check my street
Council register ↗

What’s proposed

Permission for (1) the demolition of the following: existing single storey western entrance and associated classrooms, the existing single-storey classroom block and the two-storey ancillary wing of accommodation, both to the rear of the main school building, the existing maintenance sheds, two-storey changing building and the single storey WC block. (2) The upgrading and refurbishment of main school building, which is a protected structure, to include a general upgrade of fire and life systems, the construction of a new entrance adjacent to the chapel, also a protected structure, the construction of two-storey western extension to main school building with new entrance point at lower ground level and the removal of external fire escape stair to the rear, to be replaced with enclosed fire escape stair to the east. (3) The upgrading and refurbishment of the gymnasium, a protected structure, including the provision of an external ramp to provide level access and egress. (4) The construction of new buildings to incorporate a new single-storey changing building to be provided adjacent to the gymnasium, a two storey pitched roof to the north to accommodate technology classrooms and science laboratories, and a three-storey pitched roof building to the east to accommodate art classrooms. (5) Other works include the provision of a new substation and maintenance /storage shed. (6) Works to the school grounds will consist of the construction of an all-weather sports pitch to replace an existing grass pitch to the north of the school buildings, 6 no. ballcourts, landscaping stepped terraced seating to the rear of the main school building and associated hard and soft landscaping throughout. (7) The development will also include a new vehicular access from the Longford Road. The new access will facilitate an internal bus drop-off and pick-up route. Access and parking arrangements include the provision of 92 no. car parking spaces, incorporating 5 no. disabled parking spaces, 3 no. minibus parking bays and 11 no. bicycle parking spaces. (8) To allow for all for the proposed new build, extension and refurbishment works to be carried out while the school remains operational, permission is also sought for temporary school accommodation, comprising 40 no. classrooms & ancillary accommodation, temporary set down and parking arrangements (9) New foul, water and drainage system, boundary treatment and all other site & development works

Planning details

Reference
21187
Local authority
Westmeath County Council
Status
Commenced · register status “APPLICATION FINALISED”
Received
13 Apr 2021
Observations close
18 May 2021 (closed 1980 days ago)
Decision due
14 Oct 2021 · decided 13 Oct 2021
Decision
Conditional on 13 Oct 2021
Site area
15.24 ha from the mapped boundary, not the council's figure

Nearby 4 · 500 m · 5 years

Explore this area on the map →

Homes nearby

Building started

  • 21 Nov 2023 · Builder told the council work was starting CN0107549WH

Protections nearby 250 m

  • NIAH-recorded building · 12
    post box; Saint Mary's Hospital

Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

21187 is a planning application to Westmeath County Council for permission for (1) the demolition of the following: existing single storey western, received on 13 Apr 2021; permission was granted with conditions on 13 Oct 2021.