Cornamaddy, Athlone, Co. Westmeath
Approved in Dec 2022. Building started in 2024.
- 13 May 2022Received
- 26 Oct 2022Conditional
- 6 Dec 2022Final approval
- 13 Dec 2024Building started
- Status
- Building startedi
- Decision
- Conditional · 26 Oct 2022
- Council
- Westmeath County Council
- Type
- PERMISSION
- Units
- 75
- Site
- 3.72 ha
What’s proposed
The development will consist of the following: • Construction of 75 no. residential units comprising: 51 no. 2 storey semi-detached and terraced houses (consisting 4 no. 2 bed houses and 47 no. 3 bed houses, ranging in size from c.78 sq.m – 120 sq.m each), and 24 no. 3 storey apartment/duplex units (consisting 12 no. 2 bed apartments and 12 no. 3 bed duplexes, ranging in size from 84sq.m to 121 sq.m each), with associated private gardens and east/west facing terraces; • All pedestrian and vehicular access roads and footpaths including a section of the planned east/west distributor road connecting to a section of the distributor road permitted under WMCC Reg. Ref. 14/7103/ ABP Ref. PL25.244826 to the south east of the site. • All associated site development works, services provision, drainage works, residential open space (c.0.28ha) and public open space (c.0.82ha), landscaping, boundary treatment works, public lighting, 1 no. esb substation cabinets, bin stores, car and bicycle parking provision; • Provision of a new detention basin on the eastern portion of the site designed to cater for the proposed development, in lieu of the drainage works permitted under WMCC Reg. Ref. 14/7103 / ABP Ref. PL 25.244826; • This development will form part of a larger/future phase of the development; • No changes to the existing pumping station located outside the northern site boundary; A Natura Impact Statement has been prepared in respect of this application
Planning details
- Reference
- 22253
- Local authority
- Westmeath County Council
- Status
- Commenced · register status “APPLICATION FINALISED”
- Received
- 13 May 2022
- Decision due
- 26 Oct 2022 · decided 26 Oct 2022
- Decision
- Conditional on 26 Oct 2022
- Site area
- 3.72 ha from the mapped boundary, not the council's figure
- Applicant
- Marina Quarter Ltd council register
Nearby 4 · 500 m · 12 months
- Awaiting decisionLands at , Cornamaddy Townland , Athlone
- Awaiting decisionLands at Ballykeeran and , Cornamaddy Townlands , Athlone.
- CommencedCornamaddy , Athlone , Co. Westmeath
- CommencedGarnafailagh , Athlone , Co. Westmeath
- Withdrawn30 Cornamaddy , Athlone , Co. Westmeath
- CommencedGarrynafela , Athlone , Co Westmeath
- CommencedCornamaddy , Athlone , Co.Westmeath
- WithdrawnGarrynafela , Athlone , Co Westmeath
- WithdrawnCornamaddy , Athlone , Co.Westmeath
- CommencedGarnafailagh , Athlone , Co.Westmeath
- Appeal decidedLands at Ballykeeran and Cornmaddy Townlands , Athlone , Co Westmeath
- CommencedCornamaddy , Athlone , Co. Westmeath
- CommencedCornamaddy , Athlone , Co.Westmeath
- GrantedCornamaddy , Athlone , Co. Westmeath
Homes nearby
- For saleGarnafailagh, Athlone, Co. Westmeath, N37 R1X3
- For saleCornamaddy Court, Athlone, Co. Westmeath
- For sale4 Woodville Court, Woodville Grange, Athlone, Co. Westmeath, N37 FY52
- For sale11 Sonas Village, Cloghanboy, Athlone, Co. Westmeath, N37 D155
- For saleThe Meadows at Dún an Rí, Athlone, Co. Westmeath
- For saleShow House, The Meadows, Dún An Rí, Athlone, Co. Westmeath, N37 K2E2
Building started
- 13 Dec 2024 · Builder told the council work was starting CN0123029WH
- 13 Dec 2024 · Builder told the council work was starting CN0123034WH
- 13 Dec 2024 · Builder told the council work was starting CN0123033WH
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 18 Sept 2026, 15:44 | open |
Summary
22253 is a planning application to Westmeath County Council for the development will consist of the following: • Construction of 75 no. residential, received on 13 May 2022; permission was granted with conditions on 26 Oct 2022.