Planning Register
Wicklow County Council · 2560764 · PERMISSION

In the townlands of Kilcandra , Kilnamanagh Beg Ballynagran , and Ballinaclogh Glenealy Co. Wicklow

Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness

Council received 25 Sept 2025We first saw it 11 Sept 2026, 18:51 (352 days after receipt — sources refresh weekly)
Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.

2560764 is a planning application for permission at In the townlands of Kilcandra , Kilnamanagh Beg Ballynagran , and Ballinaclogh Glenealy Co. Wicklow, received by Wicklow County Council on 25 Sept 2025 and first seen by Planning Register on 11 Sept 2026. The application describes: RED III Category 3 Development - Construction of a solar PV energy development with an operational life of 40 years on three land parcels totalling approximately 203.5 hectares comprising the installation of approximately 806,630 sq. m. of photovoltaic panels on ground mounted frames and associated ancillary development including: 23 no. transformers stations, 2 no. Ring Main Unit buildings, string-inverters attached to panel frames, CCTV security cameras mounted on 4 metre high poles, deer-proof perimeter security fencing (2 metres high) raised 150mm to allow for the movement of small mammals, 3 no. site entrances utilising existing entrances including upgrade to entrance on L1111 to facilitate construction and operational phase access, internal access tracks between the solar arrays and the site entrances, 2 no. clear span bridges over existing watercourses, 1 no. primary temporary construction compound and 2 no. satellite temporary construction compounds, all associated ancillary development works including landscaping; and the installation of a total of ca. 6.1 kilometres of 33Kv double circuit underground cable, of which ca. 2.4 kilometres will be beneath public (L1111, L1113, L5113, L51132 and L5112) and private roads in an excavated trench including underground ducting and joint bays and all associated site development and reinstatement works to connect the proposed Ring Main Units on two of the land parcels of the solar PV energy development and extending to the site of a proposed 110kv substation to be the subject of a separate planning permission under the Planning and Development (Strategic Infrastructure) Act 2006. The council granted permission on 19 Dec 2025, with conditions. The five-week observation window closed on 30 Oct 2025. The register records an appeal (PL-500687-WW-26), decided: conditional. Within 500 m there is 1 other decided application in the last five years.

Appeal window closes 26 Jan 2026 closed 229 days ago
4 weeks from the council's decision (19 Dec 2025) · s.37 Planning and Development Act 2000 · €220 to An Coimisiún Pleanála (€110 observer)

Proposal

RED III Category 3 Development - Construction of a solar PV energy development with an operational life of 40 years on three land parcels totalling approximately 203.5 hectares comprising the installation of approximately 806,630 sq. m. of photovoltaic panels on ground mounted frames and associated ancillary development including: 23 no. transformers stations, 2 no. Ring Main Unit buildings, string-inverters attached to panel frames, CCTV security cameras mounted on 4 metre high poles, deer-proof perimeter security fencing (2 metres high) raised 150mm to allow for the movement of small mammals, 3 no. site entrances utilising existing entrances including upgrade to entrance on L1111 to facilitate construction and operational phase access, internal access tracks between the solar arrays and the site entrances, 2 no. clear span bridges over existing watercourses, 1 no. primary temporary construction compound and 2 no. satellite temporary construction compounds, all associated ancillary development works including landscaping; and the installation of a total of ca. 6.1 kilometres of 33Kv double circuit underground cable, of which ca. 2.4 kilometres will be beneath public (L1111, L1113, L5113, L51132 and L5112) and private roads in an excavated trench including underground ducting and joint bays and all associated site development and reinstatement works to connect the proposed Ring Main Units on two of the land parcels of the solar PV energy development and extending to the site of a proposed 110kv substation to be the subject of a separate planning permission under the Planning and Development (Strategic Infrastructure) Act 2006.

Status
APPLICATION FINALISED
Decision
Conditional on 19 Dec 2025
Permission expires
28 May 2031
Site (from polygon)
203.57 ha
Location precision
site (coords_polygon)

Timeline

  • 25 Sept 2025
    New application
    Observation window closed 30 Oct 2025
  • 19 Dec 2025
    Decision
    Appeal window closed 26 Jan 2026
  • 26 Jan 2026
    Appeal lodged

Around this site this application first, then everything within 500 m

Explore from hereFull reportWatch
Click a dot to open its row.
Loading planning applications…
Detail from the 1837 Ordnance Survey six-inch map: townland boundaries, field patterns and roads
Full report
Freeduring launch · PDF or print
OS six-inch sheet, 1837 · public domain
Full report · within 0.5 km of the pin

Full planning report for 52.95673, -6.12025

One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.

Freeduring launch

1 Where this is — preview

1 Deadlines still open

Full reportFree while we launch — no account, no payment. Open it on screen or download the PDF.

Appeal

The register records appeal PL-500687-WW-26 (status unknown) but we have not matched the ACP case yet.

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    No zoning objective covers this site in the current plan.

    Designations within 250 m

    No OPW flood extent nearby.

    • Radon risk area · 2
      About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 20 homes in this area is likely to have high radon levels

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 166395). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/WicklowCC/AppFileRefDetails/2560764/0.

    Source: npad · fetched 11 Sept 2026, 18:51
    SourceLicenceFetchedLink
    npadCC-BY-4.011 Sept 2026, 18:51open