Site at Avoca River Park Arklow Town Marsh 10 and 11 Ferrybank Road , within the townlands of Shelton Abbey Marsh and Ferrybank , Co. Wicklow
- 22 Jan 2026Received
- 13 Aug 2026Conditional
- Status
- Granted with conditions
- Decision
- Conditional · 13 Aug 2026
- Council
- Wicklow County Council
- Type
- PERMISSION
- Site
- 3.58 ha
What’s proposed
the following works to connect Avoca River Park to public services: • an underground foul pump station and an above ground kiosk with a total height of 1.8m within a secure compound located on lands at Avoca River Park; • a watermain with a total length of c. 2.2km and a foul rising main with a total length of c. 2.2km from the proposed pump station, traversing lands within Avoca River Park, the existing trackway through the marsh, 10 and 11 Ferrybank and terminating in the public road (R772); • installation of fibre connections with a total length of c. 2.2km with fibre ducts; • connection to the existing Uisce Éireann foul network and watermain network; • all associated site development works above and below ground
2660038 is a planning application to Wicklow County Council for the following works to connect Avoca River Park to public services: • an underground, received on 22 Jan 2026; permission was granted with conditions on 13 Aug 2026.
Planning details
- Reference
- 2660038
- Local authority
- Wicklow County Council
- Status
- Granted with conditions · register status “DECISION MADE”
- Received
- 22 Jan 2026
- Observations close
- 26 Feb 2026 (closed 200 days ago)
- Decision due
- 18 Aug 2026 · decided 13 Aug 2026
- Decision
- Conditional on 13 Aug 2026
- Proposed development
- the following works to connect Avoca River Park to public services: • an underground foul pump station and an above ground kiosk with a total height of 1.8m within a secure compound located on lands at Avoca River Park; • a watermain with a total length of c. 2.2km and a foul rising main with a total length of c. 2.2km from the proposed pump station, traversing lands within Avoca River Park, the existing trackway through the marsh, 10 and 11 Ferrybank and terminating in the public road (R772); • installation of fibre connections with a total length of c. 2.2km with fibre ducts; • connection to the existing Uisce Éireann foul network and watermain network; • all associated site development works above and below groundAs published by the register.
- Site area
- 3.58 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Full planning report for 52.80797, -6.16928
Zoning, appeals, sold prices, flood and heritage constraints — everything for this area in one PDF.
No account, no payment. Not a statutory planning search.
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
- Radon risk area · 1
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 166891). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/WicklowCC/AppFileRefDetails/2660038/0.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |