Ballycumber North and Ballycumber South , , Co. Wicklow
- 5 Jun 2026Received
- 13 Aug 2026Conditional
- Status
- Granted with conditions
- Decision
- Conditional · 13 Aug 2026
- Council
- Wicklow County Council
- Type
- PERMISSION
What’s proposed
RED III Category 1 - extension of the operational life of the Ballycumber wind farm located in the townlands of Ballycumber North and Ballycumber South, County Wicklow. the development of which the operational life will be extended, consists of • 6 wind turbines with an overall tip height of 131m • anemometry mast • site access tracks • hard standing areas • electrical control building and compound • underground cabling.• ancillary works including drainage, the planning application is for an extension to the operational life of the Ballycumber Wind Farm for a further 15 years from 25 years as granted under An Coimisiún Pleanála reference PL27.241827 Wicklow County Council Pl. Ref. 13/8043 (which replaced the previous permission for a wind farm on the site granted under PL 27.236261, Wicklow County Council Pl. Ref. 09/704), to 40 year
2660498 is a planning application to Wicklow County Council for rED III Category 1 - extension of the operational life of the Ballycumber wind farm, received on 5 Jun 2026; permission was granted with conditions on 13 Aug 2026.
Planning details
- Reference
- 2660498
- Local authority
- Wicklow County Council
- Status
- Granted with conditions · register status “DECISION MADE”
- Received
- 5 Jun 2026
- Observations close
- 10 Jul 2026 (closed 66 days ago)
- Decision due
- 31 Aug 2026 · decided 13 Aug 2026
- Decision
- Conditional on 13 Aug 2026
- Proposed development
- RED III Category 1 - extension of the operational life of the Ballycumber wind farm located in the townlands of Ballycumber North and Ballycumber South, County Wicklow. the development of which the operational life will be extended, consists of • 6 wind turbines with an overall tip height of 131m • anemometry mast • site access tracks • hard standing areas • electrical control building and compound • underground cabling.• ancillary works including drainage, the planning application is for an extension to the operational life of the Ballycumber Wind Farm for a further 15 years from 25 years as granted under An Coimisiún Pleanála reference PL27.241827 Wicklow County Council Pl. Ref. 13/8043 (which replaced the previous permission for a wind farm on the site granted under PL 27.236261, Wicklow County Council Pl. Ref. 09/704), to 40 yearAs published by the register.
- Site area
- No site boundary mapped
- Applicant
- Not published — the national feed carries no applicant name council register
Full planning report for 52.84361, -6.46678
Zoning, appeals, sold prices, flood and heritage constraints — everything for this area in one PDF.
No account, no payment. Not a statutory planning search.
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 166986). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/WicklowCC/AppFileRefDetails/2660498/0.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |