PlanningRegister.ie
Mayo County Council · 2460708

Mullafarry and Tawnaghmore Upper, Killala, Co. Mayo

Decided on appeal: refused.

  1. 21 Nov 2024Received
  2. 25 Apr 2025Conditional
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.
Status
Appeal decided — refused
Decision
Conditional · 25 Apr 2025
Council
Mayo County Council
Type
PERMISSION
Site
10.55 ha

Live near Mullafarry and Tawnaghmore Upper?

Everything else planned on your street, in one report.

Check my street
Council register ↗

What’s proposed

The construction of a single data centre building located to the north of the site, with an overall gross floor area of c. 29,076 sq.m across two levels and an overall maximum height of c. 22.764m at parapet level. The data centre building includes data halls and associated electrical and mechanical plant rooms (c. 23,908 sq.m), an administrative and staff services block (c. 5,052 sq.m) and circulation and stairs (c. 116 sq.m). 2 no. external terraces are proposed to the east of the building (c. 309 sq.m) and an external generator yard to the south of the building (c. 5,205 sq.m) accommodating 25. no. backup / dispatchable generators and associated flues (to a height of c. 21.164m) within an enclosed compound. The construction of a sprinkler tank and pump house to the northeast of the site, the sprinkler tank is an overall height of c. 7.2 m and the pump house is a single storey building with an overall height of c. 4.15m and area GFA of c. 40.23 sq.m. The construction of an entrance hut at the main access to the south of the site, the hut is an overall height of c. 3.225m and area GFA of c. 11.6 sq.m. Construction of 2 no. site access points from the south and internal road network and circulation areas, footpaths, cyclist infrastructure, the provision of 56 no. car parking spaces (including 12 EV charging spaces and 7 disabled spaces, 3 of them EV), 20 no. cycle parking spaces, hard and soft landscaping and planting, site lighting, PV panels and plant at roof level, foul water connection connecting to existing WWTP in Killala Business Park, boundary treatments, green walls and all associated and ancillary works including underground foul and storm water drainage network and utility cables and all ancillary works and services. An EPA-Industrial Emissions Directive (IE) licence will be applied for to facilitate the operation of the proposed development. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application and the EIAR and NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority

Planning details

Reference
2460708
Local authority
Mayo County Council
Status
Appeal decided — refused · register status “APPLICATION FINALISED”
Received
21 Nov 2024
Observations close
6 Jan 2025 (closed 643 days ago)
Decision due
28 Apr 2025 · decided 25 Apr 2025
Decision
Conditional on 25 Apr 2025
Proposed development
The construction of a single data centre building located to the north of the site, with an overall gross floor area of c. 29,076 sq.m across two levels and an overall maximum height of c. 22.764m at parapet level. The data centre building includes data halls and associated electrical and mechanical plant rooms (c. 23,908 sq.m), an administrative and staff services block (c. 5,052 sq.m) and circulation and stairs (c. 116 sq.m). 2 no. external terraces are proposed to the east of the building (c. 309 sq.m) and an external generator yard to the south of the building (c. 5,205 sq.m) accommodating 25. no. backup / dispatchable generators and associated flues (to a height of c. 21.164m) within an enclosed compound. The construction of a sprinkler tank and pump house to the northeast of the site, the sprinkler tank is an overall height of c. 7.2 m and the pump house is a single storey building with an overall height of c. 4.15m and area GFA of c. 40.23 sq.m. The construction of an entrance hut at the main access to the south of the site, the hut is an overall height of c. 3.225m and area GFA of c. 11.6 sq.m. Construction of 2 no. site access points from the south and internal road network and circulation areas, footpaths, cyclist infrastructure, the provision of 56 no. car parking spaces (including 12 EV charging spaces and 7 disabled spaces, 3 of them EV), 20 no. cycle parking spaces, hard and soft landscaping and planting, site lighting, PV panels and plant at roof level, foul water connection connecting to existing WWTP in Killala Business Park, boundary treatments, green walls and all associated and ancillary works including underground foul and storm water drainage network and utility cables and all ancillary works and services. An EPA-Industrial Emissions Directive (IE) licence will be applied for to facilitate the operation of the proposed development. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application and the EIAR and NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority
As published by the register.
Site area
10.55 ha from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name council register

Nearby 5 · 500 m · 5 years

Explore this area on the map →

Homes nearby

Appeal

Appeal ABP-322575-25 (status unknown), not yet matched.

Zoning

Not zoned in the current plan.

Protections nearby 250 m

No mapped flood area nearby.

  • NIAH-recorded building · 2
    manse; rectory/glebe/vicarage/curate's house
  • Recorded monument · 2
    Ringfort - rath; R157150

Where this comes from

National planning feed (NPAD), fetched 22 Sept 2026, 16:10.

Source: npad · fetched 22 Sept 2026, 16:10
SourceLicenceFetchedLink
npadCC-BY-4.022 Sept 2026, 16:10open
Summary

2460708 is a planning application to Mayo County Council for the construction of a single data centre building located to the north of the site, with, received on 21 Nov 2024; permission was granted with conditions on 25 Apr 2025.