Plot 100, Profile Park, Nangor Road, Clondalkin, Dublin 22
Approved in May 2022. No sign of building yet.
- 5 Jul 2021Received
- 24 Mar 2022Approved
- 5 May 2022Final approval
- 5 May 2027Approval runs out
Earlier approval here ran out with no sign of building: SD12A/0150 (2012)
- Status
- Approved
- Decision
- Approved · 24 Mar 2022
- Council
- South Dublin County Council
- Type
- Permission
- Site
- 2.79 ha
What’s proposed
Construction of a 3 storey (part 4 storey) data centre known as 'DB8' to include data halls, electrical/plant rooms including internal generators, offices, lobbies, ancillary staff areas including break rooms and toilets, stores, stair/lift cores throughout and photovoltaic panels at roof level; the total gross floor area excluding hot air plenums and external staircase is c.9,601sq.m and the overall height of the data centre ranges from c.16m to c.20m to roof parapet level and up to c.24.48m including roof top plant, flues and lift overrun; provision of 5 external generators, 8 fuel tanks and ancillary plant contained within a plant yard to the north of DB8; provision of a water tank plant room, air cooled chillers and ancillary plant contained within a chiller plant yard to the south of DB8; provision of a water sprinkler pump room (c.23sqm), 2 sprinkler tanks (c.12m high each), heat recovery plant room (c.17sqm), ESB substation (c.44sqm), waste/bin stores (c.52sqm); total floor area of ancillary structures and plant (c.303sqm); provision of a delivery yard and loading bays, 64 car parking spaces, 5 motorcycle spaces, bicycle shelter serving 14 spaces, smoke shelter, internal access roads and footpaths, vehicular and pedestrian access to the west from Falcon Avenue and closure of an existing vehicular entrance from Falcon Avenue; all associated site development works, services provision, drainage works including attenuation, landscape and boundary treatment works including berming, hedgerow protection areas and security fencing; no buildings are proposed above the existing ESB wayleave and SDCC watermain wayleave to the west and north of the site; the area to the southwest of the site (temporary meadow) is reserved for a future data centre, subject of a separate application to South Dublin County Council on a site bounded to the east and south by Grange Castle Golf Club, to the north by Nangor Road (R134) and to the west by an estate road known as Falcon Avenue. This application is accompanied by a Natura Impact Statement
Planning details
- Reference
- SD21A/0186
- Local authority
- South Dublin County Council
- Status
- Granted · register status “Decision Following A.I.”
- Received
- 5 Jul 2021
- Observations close
- 1 Apr 2022 (closed 1660 days ago)
- Decision due
- 24 Mar 2022 · decided 24 Mar 2022
- Decision
- Grant permission on 24 Mar 2022
- Site area
- 2.79 ha from the mapped boundary, not the council's figure
- Applicant
- Equinix Ireland Ltd council register
Nearby 19 · 500 m · 5 years
- GrantedGrangecastle Motor Company site, at Profile Park, Ballybane, Dublin 22
- GrantedProfile Park (in the townland of Kilbride), Clondalkin, Dublin 22
- CommencedProfile Park (in the townland of Kilbride), Clondalkin, Dublin 22
- GrantedUnit 7, Kilcarbery Business Park, New Nangor Road, Ballybane, Dublin 22
- CommencedProfile Park, New Nangor Road (R134), Clondalkin, Dublin 22
- Appeal decidedGrange Castle Business Park South and Profile Park,, Baldonnell, Dublin, D22 X602
- CommencedLands south of the New Nangor Road (R134), Profile Park, Dublin 22
- CommencedProfile Park, Baldonnell, Dublin 22, D22 C7W4
Show all 19
- GrantedSite at Profile Park, south of new Nangor Road (R134), within the townlands of Kilbride & Ballybane, Dublin 22
- GrantedAt Profile Park, To the South of the New Nangor Road (R134), Dublin 22
- CommencedGrange Castle Business Park, Nangor Road, Clondalkin, Dublin 22
- WithdrawnGrange Castle Business Park, Nangor Road, Clondalkin, Dublin 22
- GrantedGrange Castle Business Park, Nangor Road, Clondalkin, Dublin 22
- CommencedOn lands to the south of the New Nagor Road, Dublin 22
- WithdrawnGrange Castle Business Park, Nangor Road, Clondalkin, Dublin 22
- Appeal decidedSite within the townlands of Ballybane & Kilbride, Clondalkin, Dublin 22
- Appeal decidedPlot 100, Profile Park, Nangor Road, Clondalkin, Dublin 22
- RefusedKilcarberry Business Park, Nangor Road, Clondalkin, Dublin 22
- CommencedGrange Castle Business Park, Grange, Dublin 22
Homes nearby
- For sale41 Rowan Walk, Kilcarbery Grange, Clondalkin, Dublin 22
- For sale11 Rowan Walk, Kilcarbery, Dublin 22, D22 T0H7
- For saleApartment 8, The Gables, Grange Castle, Dublin 22, D22 V821
- For sale3 Rowan Park, Kilcarbery, Dublin 22, D22 A2C1
- For sale6 Castlegrange Green, Clondalkin, Dublin 22, D22 F678
- For saleBaldonnell House on c. 3.5 Acres, Baldonnell Lower, Grange Castle, Dublin 22, D22 N1N2
Development land nearby
From Buildable, our sister site for development land in Dublin.
- Council selling land — Land at Kilcarbery (0.5 km)
- Public land off Grange Castle Business Park, Kilmahuddrick, Dublin 22 (0.4 km)
Zoning
Zoned for employment uses. Housing is not the intended use here.
Open space with active recreational amenities — pitches, courts, play areas.
Protections nearby 250 m
Flood area nearby (OPW maps). floodinfo.ie ↗
- EPA-licensed facility · 3
Where this comes from
National planning feed (NPAD), fetched 14 Oct 2026, 01:45.
Source: National Planning Application Database · fetched 14 Oct 2026, 01:45
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 14 Oct 2026, 01:45 | open |
Summary
SD21A/0186 is a planning application to South Dublin County Council for construction of a 3 storey (part 4 storey) data centre known as 'DB8' to include data, received on 5 Jul 2021; permission was granted on 24 Mar 2022.