PlanningRegister.ie
South Dublin County Council · SD22A/0420

Site within the townlands of Ballybane & Kilbride, Clondalkin, Dublin 22

Decided on appeal: refused.

  1. 8 Nov 2022Received
  2. 29 May 2023Refuse permission
  3. 26 Jun 2023Appealed
  4. 26 Mar 2024Approval runs out
  5. 4 Apr 2025Appeal: Refused
Status
Appeal decided — refused
Decision
Refuse permission · 29 May 2023
Council
South Dublin County Council
Type
Permission
Site
3.66 ha
Appeal
ACP 317446 · Refused

Live near Site within the townlands of Ballybane…?

Everything else planned on your street, in one report.

Check my street
Council register ↗

What’s proposed

Development on a Site that includes a two storey residential property on lands to the south of the New Nangor Road (R134), Dublin 22; and on land within the townlands of Ballybane and Kilbride within Profile Park, Clondalkin, Dublin 22 on an overall site of 3.79hectares; The development will consist of the demolition of the two storey dwelling (207.35sqm) and associated outbuildings and farm structures (348.36sq.m); and the construction of 1 two storey data center with plant at roof level and associated ancillary development that will have a gross floor area of 12,893sqm that will consist of the following, 1 two storey data center (Building 13) with a gross floor area of 12,893sqm. It will include 13 emergency back-up generators of which 12 will be double stacked and one will be single stacked within a compound to the south-western side of the data center with associated flues that each will be 22.316m in height and 7 hot-air exhaust cooling vents that each will be 20.016m In height; The data center will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, and plant including PV panels at roof level as well as a separate house generator that will provide emergency power to the admin and ancillary spaces. Each generator will include a diesel tank and there will be a refuelling area to serve the proposed emergency generators; The data center will have a primary parapet height of 14.246m above ground level, with plant and screen around plus a plant room above at roof level. The plant room has an overall height of 21.571m; Construction of an internal road network and circulation areas, with a staff entrance off Falcon Avenue to the east, as well as a secondary vehicular access for service and delivery vehicles only across a new bridge over the Baldonnel Stream from the permitted entrance as granted under SDCC Planning Ref. SD21A/0241 from the south-west, both from within Profile Park that contains an access from the New Nangor Road (R134); Provision of 60 car parking spaces (to include 12 EV spaces and 3 disabled spaces), and 34 cycle parking spaces; Signage (5.7sq.m) at first floor level at the northern end of the eastern elevation of the data center building; Ancillary site development works will include footpaths, attenuation ponds that will include an amendment to the permitted attenuation pond as granted to the north of the Baldonnel Stream under SDCC Planning Ref. SD21 A/0241, as well as green walls and green roof. The installation and connection to the underground foul and storm water drainage network, and installation of utility ducts and cables, that will include the drilling and laying of ducts and cables under the internal road network within Profile Park. Other ancillary site development works will include hard and soft landscaping that will include an amendment to the permitted landscaping as granted under SDCC Planning Ref. SD21A/0241, lighting, fencing, signage, services road, entrance gates, and sprinkler tanks; An Environmental Impact Assessment Report (EIAR) has been submitted with this application

Planning details

Reference
SD22A/0420
Local authority
South Dublin County Council
Status
Appeal decided — refused · register status “Appeal decided”
Received
8 Nov 2022
Observations close
9 May 2023 (closed 1261 days ago)
Decision due
29 May 2023 · decided 29 May 2023
Decision
Refuse permission on 29 May 2023
Site area
3.66 ha from the mapped boundary, not the council's figure

Nearby 16 · 500 m · 5 years

Show all 16

Explore this area on the map →

Homes nearby

Development land nearby

From Buildable, our sister site for development land in Dublin.

See all development land near here →

Appeal

ACP 317446 · Planning Appeal · decided · Refused 4 Apr 2025
received by the Commission 26 Jun 2023 · inspector's report · board order

Zoning

C2.1 — Economic development and employment

Zoned for employment uses. Housing is not the intended use here.

Protections nearby 250 m

Flood area nearby (OPW maps). floodinfo.ie ↗

  • EPA-licensed facility · 4
    P1191; P1196

Where this comes from

National planning feed (NPAD), fetched 14 Oct 2026, 01:45.

Source: National Planning Application Database · fetched 14 Oct 2026, 01:45
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.014 Oct 2026, 01:45open
Summary

SD22A/0420 is a planning application to South Dublin County Council for development on a Site that includes a two storey residential property on lands to the, received on 8 Nov 2022; permission was refused on 29 May 2023.