Apartment 1, Whitebeam Hall, Leopardstown, Dublin 18, D18 PCA2
Open nearby: 2 applications open for comments, the nearest 256 m away. See the file →
13 applications lodged within 500 m in 12 months (typical in Dublin: 18 a year)
Scheme nearby: Leopardstown Village Centre Site B, 57 homes, 57 not started, 410 m away. See the scheme →
What to ask before you buy. First: what is planned for about 57 homes 410 m away?
Listed on daft.ie · Listed by Moovingo · no longer advertised (last seen 21 Sept 2026)
Planning around this home
| Description | Details | |||||||
|---|---|---|---|---|---|---|---|---|
| Open | 23 Nov 2026 | D26A/0887/WEB DLR | Lands at and between, Carrickmines 220kV Substation, Ballyogan Road, Dublin 18, D18 X0D0 and Blackrock Park, Rock Road, Dublin | The development will consist of the provision of: a c. 7.03km underground cable operating… | — | 38 days left 6 Jan | 256 m | |
| Awaiting decision | 12 Oct 2026 | D26A/0763/WEB DLR | Lands at and between, Carrickmines 220kV Substation, Ballyogan Road, Dublin 18, D18 X0D0 and,, Blackrock Park, Blackrock Park, Rock Road, Blackrock, Dublin.A94HWF6 | The development will consist of the provision of: a c. 7.03km underground cable… | — | — | 256 m | |
| Granted | 30 Jul 2026 | D26B/0435 DLR | 16, Glenbourne Close, Leopardstown Valley, Dublin 18, D18Y0H6 | (a) single storey extension to rear and (b) loft conversion with new dormer to t… | 22 Sept 2026 | — | 237 m | |
| Granted | 16 Mar 2026 | D26A/0204 DLR | ESB's Carrickmines 220KV Substation, Ballyogan Road, Carrickmines, Dublin 18 | We, ESB Telecoms Ltd seek permission for the installation of solar panels on a s… | 6 May 2026 | — | 266 m | |
| Commenced | 12 Dec 2025 | D25A/0969/WEB DLR | 12, Glencairn Glade, The Gallops, Dublin 18, D18YP04 | The proposed development will consist of the construction of 2 no. three-bedroom… | 24 Mar 2026 | — | 275 m | |
| Open | 20 Nov 2026 | D26A/0873/WEB DLR | 8 Glenbourne Park, Leopardstown Valley, Dublin 18, D18A9K7 | The development consists of widening the existing vehicular entrance to the front of the b… | — | 36 days left 4 Jan | 447 m | |
| Awaiting decision | 22 May 2026 | PC/IC/01/26 DLR | National Mobility Hubs Pilot: Dún Laoghaire-Rathdown, 73 Locations Across the Council's Administrative Area, Dún Laoghaire-Rathdown | 73 mobility hub sites across the Council's administrative area | — | — | 410 m | |
| Withdrawn | 3 Apr 2026 | D26B/0198/WEB DLR | 21 Clay Farm Glade, Dublin 18, D18 C3HW | Planning Permission for single storey extension to side. | 20 May 2026 | — | 377 m | |
| Granted | 2 Apr 2026 | D26B/0195/WEB DLR | 21 Clay Farm Glade, Kilgobbin, Dublin 18, D18C3HW | Planning Permission for single storey extension to side. | 25 May 2026 | — | 377 m | |
| Granted | 24 Oct 2025 | D25B/0609/WEB DLR | 12 Clay Farm Grove, Kilgobbin, Dublin 18, D18Y3XP | Conversion of existing second floor storage space comprising of modification of… | 10 Dec 2025 | — | 382 m | |
| Commenced | 11 Jun 2026 | D26B/0341/WEB DLR | 9, Glenbourne Walk, Leopardstown Valley, Dublin 18, D18E9X5 | An attic conversion for storage, raising the side gable to form a pitched roof,… | 27 Jul 2026 | — | 386 m | |
| Commenced | 30 Jan 2026 | D26B/0053/WEB DLR | 5, Glenbourne Green, Leopardstown Valley, Dublin, D18V403 | Permission is sought for the building up of the side gable wall at roof level,… | 23 Mar 2026 | — | 438 m | |
| Granted | 19 Dec 2025 | D25B/0725/WEB DLR | 26, Glencairn Crescent, The Gallops, Dublin 18, D18X8P8 | Conversion of the existing attic space with new dormer roof space to rear and ro… | 17 Feb 2026 | — | 473 m | |
| Withdrawn | 17 Dec 2025 | D25B/0707/WEB DLR | 26 Glencairn Crescent, The Gallops, Leopardstown, Dublin 18, D18X8P8 | Permission is sought for: Conversion of the existing attic space with new dormer… | 18 Dec 2025 | — | 473 m |
Full planning report
Everything planned around Apartment 1, in full
What neighbours were allowed and refused, what can still change, and what protects the site. Yours to keep as a PDF.
- 45 applications
- 2 still open
- 32 granted




4 of about 30 pages, from a sample report in Blackrock.
Your report includes:
- The property's own planning history, back to the start of the council's online records
- Every application within 500 m: granted, refused and appealed, on a map
- What neighbours were allowed to build, and what was refused
- Deadlines to object, and sites nearby that could change
- New homes and developments coming, and building work started
- Zoning, conservation areas, protected structures and flood risk
- Questions to ask your solicitor or surveyor
VAT included · Secure checkout by Stripe · Opens straight after payment · PDF emailed to you
Not a statutory planning search.
About this home
Within 500 m of Apartment 1, Whitebeam Hall, Leopardstown, Dublin 18, D18 PCA2, Planning Register tracks 45 planning applications: 2 open for comments, 2 awaiting a decision, 32 granted, 5 refused, 16 building started. The soonest observation deadline is 4 Jan 2027 on DLR D26A/0873/WEB (8 Glenbourne Park, Leopardstown Valley, Dublin 18, D18A9K7). The home is a 1-bedroom apartment in Kilgobbin, Dun Laoghaire-Rathdown of about 60 m² (BER A3).
More about this address
It was advertised for sale on daft.ie until 21 Sept 2026; the advertisement has since been taken down. The site is zoned R2 — existing residential. It is in the Clay Farm estate, where 13 planning applications were made in 10 years, 70% of those decided granted. The nearest EPA-licensed facility is Ballyogan Landfill Facility Ballyogan Recycling Park, 383 m away. The nearest named scheme is Clay Farm, 935 homes (888 built, 47 under construction), 100 m away.
- Type
- Apartment
- Bedrooms / bathrooms
- 1 / 1
- Floor area
- 60 m²
- BER
- A3
- Year built
- 2020
- Eircode
- D18 PCA2
- Local authority
- Dún Laoghaire-Rathdown County Council
- Estate
- Clay Farm
- EPA licence within 1.0 km
- Ballyogan Landfill Facility Ballyogan Recycling Park (383 m)
- Named schemes within 1.0 km
- Clay Farm · 935 homes +7 more
- Schools within 1.0 km
- HOLY TRINITY NATIONAL SCHOOL (primary school · 586 pupils, 586 m) +3 more
- Crèche inspected nearby
- Naionra Thaobh na Coille · inspected 8 Jan 2026 (888 m)