PlanningRegister.ie
No longer advertised · 3 bed · 1 bath · 106 m² · BER D

46 Oakton Park, Ballybrack, Co. Dublin, A96 A5X2

Open nearby: an application 369 m away is open for comments. See the file →

25 applications within 500 m in 12 months (typical in Dublin: 18 a year)

7 of 7extensions approved
Get the report

What's planned, stalled or derelict around it.

Listed on daft.ie · Listed by DNG Dun Laoghaire · no longer advertised (last seen 9 Oct 2026)

Planning around this home

Distance
Time
Click a dot to open its row.
26 of 26 planning applications within 500 m in the last year · nearest first
DescriptionDetails
Granted6 Mar 2026D26B/0128
DLR
22, Dale View, Ballybrack, Dublin, A96V2P7Construction of single and two-storey extension and all associated site works to…28 Apr 2026—115 m
Awaiting decision22 May 2026PC/IC/01/26
DLR
National Mobility Hubs Pilot: Dún Laoghaire-Rathdown, 73 Locations Across the Council's Administrative Area, Dún Laoghaire-Rathdown73 mobility hub sites across the Council's administrative area——238 m
Commenced10 Dec 2025D25B/0692/WEB
DLR
30, Oakton Park, Ballybrack, Glenageary, Co. Dublin, A96Y6R01) Construct an extension to the side of the house at (a) ground level, (b) firs…9 Feb 2026—171 m
Appeal granted19 Dec 2025D25B/0718/WEB
DLR
1, Oakton Park, Ballybrack, Co. Dublin, A96P9V0Planning permission for attic conversion with dormer to rear roof to accommodat…16 Feb 2026—188 m
Refused5 Jan 2026D26A/0002/WEB
DLR
Site adjoining No. 29, Dale View, Ballybrack, Co. Dublin, A96A2P2Retention planning permission for the change of use of Site adjoining no.29, Dal…25 Feb 2026—218 m
Commenced4 Dec 2025D25A/0936/WEB
DLR
Saint Johns National School, Wyatville Road, Ballybrack, Glenageary, Co. Dublin, A96NW60Permission is sought for a single storey extension to rear (southern area of the…4 Feb 2026—268 m
Granted25 Sept 2026REF15026
DLR
83, Glenavon Park, Ballybrack, DUBLIN, A96N4V9The SEAI are going to wrpa the extension and need permission to put the wrapping…19 Oct 2026—271 m
Granted28 Jul 2026D26B/0431/WEB
DLR
190, Ashlawn Park, Ballybrack, Dublin, A96H9F3Retention Permission for: The construction of a single-storey garage/storage to…16 Sept 2026—280 m
Refused27 May 2026REF8126
DLR
190 Ashlawn Park, Ballybrack, Glenageary, Dublin, A96 H9F3Block built construction with flat roof circa 20+ years, WC tied into existing s…22 Jun 2026—280 m
Granted3 Apr 2026D26B/0202/WEB
DLR
3 Church Road, Ballybrack, Glenageary, Co. Dublin, A96K6D6The development will consist of the conversion of the existing attic space to h…25 May 2026—283 m
Withdrawn12 Mar 2026D26B/0138/WEB
DLR
3 Church Road, Ballybrack, Glenageary, Co. Dublin, A96K6D6The development will consist of the conversion of existing attic space to habit…13 Mar 2026—283 m
Open9 Nov 2026D26B/0574/WEB
DLR
5 Mountain View Rd, Kiliney, Dublin, A96X9D9Construction of a single-storey flat-roof rear extension.—19 days left
14 Dec
369 m
Granted18 Jun 2026V/045/26
DLR
Lands to the North of No. 24 Church Road, Ballybrack,, Co. Dublin1 Unit24 Jun 2026—327 m
Granted18 Jun 2026D26A/0456/WEB
DLR
Lands to the North of No. 24 Church Road, Ballybrack, Co. Dublin(i) The demolition of a storage shed (60.3sqm); (ii) The construction of 1 no. t…11 Aug 2026—327 m
Granted21 Mar 2026D26B/0160/WEB
DLR
7, Pinewood, Glenageary, Co. Dublin, A96K2F6Single-storey pitched-roof front extension with rooflight, and singlestorey mono…8 May 2026—337 m
Granted17 Jun 2026D26A/0452/WEB
DLR
Maple Grove, Church Road, Killiney, Dublin, A96KW84Alterations to development previously permitted under Planning Register Referenc…6 Aug 2026—338 m
Granted4 Mar 2026D26A/0168/WEB
DLR
Maple Grove, Church Road, Killiney, Dublin, A96KW84Alterations to previously approved Planning Register Reference No. D23A/0312. Th…27 Apr 2026—338 m
Granted9 Jun 2026D26A/0429/WEB
DLR
Ridge Hall House, Shanganagh Road, Ballybrack, Co. Dublin, A96N8W7 ( protected structure).(1)The renovation and change of use of the existing fire damaged building into 5…31 Jul 2026—345 m
Withdrawn12 Nov 2025D25A/0863/WEB
DLR
Ridge Hall House, Shanganagh Road, Ballybrack, Co. Dublin, A96N8W7 (Protected Structure)Renovation and change of use of the existing fire damaged building into 5 No. a…19 May 2026—346 m
Granted7 May 2026D26B/0275/WEB
DLR
Kelsha Cottage,1 Mountain View Road, Killiney, Co Dublin, A96XP04Permission is sought for the following: (a). Demolition and removal of the exist…29 Jun 2026—361 m
Granted (cond.)13 May 2026D26A/0364/WEB
DLR
Ballybrack Shopping Centre, Churchview Road,Ballybrack,Glenageary,Co DublinThe development will consist of: (i)the construction of a single storey extens…7 Jul 2026—363 m
Appeal refused28 Jan 2026D26B/0042
DLR
76, Pinewood, Ballybrack, Dun Laoghaire, Co. Dublin, A96W8D2Retention planning permission, including revisions addressing reasons for refusa…23 Mar 2026—373 m
Appealed12 May 2026D26A/0360/WEB
DLR
Montebello House(i) construction of a three-storey over basement level residential apartment bl…3 Jul 2026—494 m
Granted20 Mar 2026D26B/0163
DLR
9, Laragh, Killiney, Dublin, A96TF60Development will consist of demolishing existing shed to the side of the existin…7 May 2026—464 m
Withdrawn11 Mar 2026D26B/0133
DLR
9, Laragh, Killiney, Co. Dublin, A96TF60Demolishing existing shed to the side of the existing house and replacing with a…12 Mar 2026—464 m
Withdrawn11 May 2026D26A/0353/WEB
DLR
Lands at Montebello House, Killiney Hill Road, Killiney, Co. Dublin, A96CP08 - A Protected Structure(i) construction of a three-storey over basement level residential apartment bl…12 May 2026—494 m

Full planning report

The full planning report for 46 Oakton Park

Everything planned, built and refused around it, in one report you keep. Read it before you buy, build or object.

  • 83 applications
  • 1 still open
  • 58 granted
Sample report page: Your questions, answered
Your questions, answered
Sample report page: Every application on a map
Every application on a map
Sample report page: Deadlines and sites that could change
Deadlines and sites that could change
Sample report page: Homes coming, appeals, building work
Homes coming, appeals, building work

4 of about 30 pages, from a sample report in Blackrock.

Your report includes:

  • Every application within 500 m: granted, refused and appealed, on a map
  • What neighbours were allowed to build, and what was refused
  • Deadlines to object, and sites nearby that could change
  • New homes and developments coming, and building work started
  • Zoning, conservation areas, protected structures and flood risk
  • Questions to ask your solicitor or surveyor

VAT included · Secure checkout by Stripe · Opens straight after payment · PDF emailed to you

Not a statutory planning search.

Open on the full map →

About this home

Within 500 m of 46 Oakton Park, Ballybrack, Co. Dublin, A96 A5X2, Planning Register tracks 83 planning applications: 1 open for comments, 1 awaiting a decision, 58 granted, 12 refused, 2 under appeal, 17 building started. The soonest observation deadline is 14 Dec 2026 on DLR D26B/0574/WEB (5 Mountain View Rd, Kiliney, Dublin, A96X9D9). The home is a 3-bedroom semi-detached house in Loughlinstown, Dun Laoghaire-Rathdown of about 106 m² (BER D).

More about this address

It was advertised for sale on daft.ie until 9 Oct 2026; the advertisement has since been taken down. The site is zoned R2 — existing residential. It is in the Oakton Park estate, where 10 planning applications were made in 10 years, 88% of those decided granted. EPA radon map: “About 1 in 5 homes in this area is likely to have high radon levels”. The nearest named scheme is Montebello House, 32 homes, 494 m away.

Type
Semi-D
Bedrooms / bathrooms
3 / 1
Floor area
106 m²
BER
D
Eircode
A96 A5X2
Local authority
Dún Laoghaire-Rathdown County Council
Estate
Oakton Park
Radon (EPA)
About 1 in 5 homes in this area is likely to have high radon levels
Named schemes within 1.0 km
Montebello House · 32 homes +7 more
Schools within 1.0 km
ST JOHNS N S (primary school · 165 pupils, 324 m) +7 more
Crèche inspected nearby
Tigers Childcare · inspected 4 Aug 2026 (261 m)