Tinryland , Co Carlow , Co Carlow
the renovation of the existing Dwelling, to include the demolition of the existing Porch the construction of a 2 storey extension to the rear elevation, , New Entrance, a Domestic Garage, proposed Septic Tank and Percolation area, Connections services and all associated site works
The application
- Reference
- 2660278 · full record
- Authority
- Carlow County Council
- Type
- PERMISSION
- Status
- INCOMPLETED APPLICATION
- Applicant
- not published by the national dataset — see the council register
- Units
- 0
- Floor area
- —
- Site area
- 3,544 m²
- Received
- 12 Sept 2026
- We first saw it
- 22 Sept 2026, 16:10
- Decision due
- —
- Decision
- N/a
The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/CarlowCC/AppFileRefDetails/2660278/0.
- Write your observation.Quote
2660278at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Carlow County Council takes it online with the submission or at the counter.
- Submit before 19 Oct 2026.Online through the register above, or in writing to the Planning Department, Carlow County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
No current zoning polygon covers this site in the store.
Designations on or near the site
- Radon risk area × 1About 1 in 10 homes in this area is likely to have high radon levels
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 2660025 | Conditional | 28 May 2026 | 2 | 0 m | construction of a part single storey, part two storey dwelling house, detached garage, new entrance, new waste water treatment system and percolation area, connection to mains water and all associated site works |
| 2560426 | Conditional | 6 May 2026 | 1 | 329 m | a new single storey two bedroom dwelling, new residential site entrance, new waste water treatment system plus all associated site works including all over ground / underground services to facilitate the development |
| 2560206 | Conditional | 9 Sept 2025 | 1 | 115 m | retention planning permission is sought to retain the demolition of single storey sunroom to the rear of existing dwelling house, for the retention of the change of use of domestic garage including alterations to same for use as utility area ancillary to the dwelling house, retention planning permission is sought to retain the single storey extension as constructed to the rear of the existing dwelling house linking the original garage and the existing dwelling house, all ancillary site works and services |
| 2460205 | Conditional | 24 Apr 2025 | 0 | 0 m | A 10 Year planning permission for a solar farm with a total area of circa 73 hectares in the townlands of Ballybar Lower, Ballybar Upper, Ballycarney, Ballyloo, Linkardstown, Park and Tinryland in County Carlow. The solar farm will consist of solar panels on ground mounted frames, 11 no. single storey electrical inverter/transformer stations, 3 no. single storey spare parts containers, 2 no. Ring Main Units, 3 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L1010, L3051, L3052 and L3050 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 3 no. watercourse/drain deck crossings and 2 no. horizontal directional drill crossings (under M9 motorway and L3050), temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 2 no. entrances from the L1022 and L1010. Sections of the proposed underground electrical cabling will traverse the solar farm proposed under Carlow County Council Reference 24/60043, but will not alter infrastructure proposed under that application. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application |
| 2460332 | Conditional | 12 Dec 2024 | 0 | 414 m | the demolition of all existing structures within the Tinryland Wastewater Treatment Plant and the construction on an extended site (0.09 ha in total) which will consist of a new pumping station (17m2), new below-ground storm tank (total storage of 123m³), replacement welfare facility (33m2), ground-mounted photovoltaic array (83 m2), new palisade perimeter fencing (2.4m high) and associated works; the construction of a new rising main and gravity main (3.7km in length) along the Nurney Road, L1023 and N80, connecting to the existing wastewater sewer at Ballinacarrig; and all ancillary and associated temporary works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application |
| 22364 | Conditional | 24 Feb 2023 | 1 | 312 m | Usage of the 1st and 2nd floors as classrooms, including external stairs to the rear. Planning Permission is also sought for the provision of additional parking to the rear |
| 22158 | Conditional | 25 Oct 2022 | 2 | 437 m | the construction of a new dwelling, domestic garage, onsite waste water treatment system, percolation area and all associated site and landscaping works at Kilmeaney, Tinryland, County Carlow. |
Appeals
No appeals within 500 m in the last 5 years.
What has happened on this file
- 12 Sept 2026 New application · observations close 19 Oct 2026
- 12 Sept 2026 Decision
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 22 Sept 2026, 16:10. Not legal advice — confirm the deadline with Carlow County Council before relying on it.