PlanningRegister.ie
Observation pack · Carlow County Council

Lissalican , Borris , Co Carlow

The construction of a new dormer style dwelling, domestic well, new onsite wastewater treatment plant and percolation area along with all associated site and landscaping works including alterations to the existing site entrance

Observations close 24 Nov 2026 6 days left
5 weeks from receipt (received 20 Oct 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 14 Dec 2026

The application

Reference
2660323 · full record
Authority
Carlow County Council
Type
PERMISSION
Status
NEW APPLICATION
Site area
2,341 m²
Received
20 Oct 2026
Decision due
14 Dec 2026

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/CarlowCC/AppFileRefDetails/2660323/0.
  2. Write your observation.Quote 2660323 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Carlow County Council takes it online with the submission or at the counter.
  4. Submit before 24 Nov 2026.Online through the register above, or in writing to the Planning Department, Carlow County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2460410Conditional6 Jun 202530 m• the replacement (“restringing”) of the existing overhead line circuit conductor wires with a new higher capacity conductor • the strengthening of foundations at 7no. locations • shear block remedial works at 77no. locations • the strengthening of towers (i.e., member replacement) at 34no. locations • the replacement of 5.1km of earthwire • the painting of all structures • the replacement of insulating and ancillary hardware at structures • all associated works within the existing Kellis 220kV substation to accommodate the uprated 220kV OHL including uprating of the Great Island bay in Kellis 220kV substation • the installation of a temporary link between the Great Island – Kellis and Dunstown = Kellis 220kV OHLs to create a temporary circuit, which will include the erection of a temporary four-pole timber structure between the existing Angle Mast 191 on the Great Island- Kellis circuit and the existing Angle Mast 157 on the Dunstown – Kellis circuit • all associated temporary site development works to gain access to the existing structures including vegetation clearance and management, disassembly and reassembly of gate posts/piers and removal and reinstatement of existing fencing, and • other temporary associated and ancillary site development works required for the purpose of the uprate of the existing circuit, including construction compounds, silt traps, silt fences, vegetation clearance and management, stone tracks, ground protection mats, infrastructure crossing support systems (i.e., guard poles) and temporary watercourse crossings. Where required, an aerial catenary stringing system (ACSS) will be used to facilitate stringing operations over major obstacles, e.g., busy national roads, wide rivers, etc. A Natura Impact Statement will be submitted to the Planning Authority with the application. Please see Site Notice for full development description
2460157Conditional26 Jul 20241477 mthe replacement of existing derelict house in accordance with Carlow County Development Plan policy no.3.1.16.11. The proposed development includes the construction of a replacement Two-Storey Farmhouse style Dwelling, new wastewater treatment system and all associated site development works
2460042Conditional21 Jun 20242451 mplanning permission to construct a single storey dwelling, detached single storey garage, new entrance, septic tank and percolation area, bored well and all associated site works

What has happened on this file

  • 20 Oct 2026 New application · observations close 24 Nov 2026
  • 20 Oct 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 28 Oct 2026, 01:34. Not legal advice — confirm the deadline with Carlow County Council before relying on it.