Cloghna , Milford , Co. Carlow
the demolition of a single storey cottage to be replaced with the construction of a two storey dwelling, domestic garage, upgrading of existing entrance, bored well, secondary treatment system & soil polishing filter, and all associated site works
The application
- Reference
- 2660324 · full record
- Authority
- Carlow County Council
- Type
- PERMISSION
- Status
- INCOMPLETED APPLICATION
- Applicant
- not published by the national dataset — see the council register
- Units
- 0
- Floor area
- —
- Site area
- 3,483 m²
- Received
- 20 Oct 2026
- We first saw it
- 28 Oct 2026, 01:34
- Decision due
- —
- Decision
- N/a
The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/CarlowCC/AppFileRefDetails/2660324/0.
- Write your observation.Quote
2660324at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Carlow County Council takes it online with the submission or at the counter.
- Submit before 24 Nov 2026.Online through the register above, or in writing to the Planning Department, Carlow County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
No current zoning polygon covers this site in the store.
Designations on or near the site
- Radon risk area × 1About 1 in 10 homes in this area is likely to have high radon levels
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 2560137 | Conditional | 31 Oct 2025 | 0 | 2 m | A 10 Year Planning Permission for a solar farm with a total area of circa 57 hectares. The solar farm will consist of solar panels on ground mounted frames, 8 no. single storey electrical inverter/transformer stations, 2 no. single storey spare parts containers, 1 no. Ring Main Unit, 3 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L4038, L8185, R448, L3051, L3052 and L3050 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 5 no. watercourse/drain deck crossings and 2 no. horizontal directional drill crossings (under M9 motorway and the Dublin - Waterford railway), temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 2 no. existing entrances from the R448 and L1010. Sections of the proposed underground electrical cabling will traverse the solar farms proposed under Carlow County Council References 24/60043 and 24/60205, but will not alter infrastructure proposed under these applications. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application. |
| 2560022 | Conditional | 29 May 2025 | 2 | 300 m | to construct a dwelling house, domestic garage, waste water treatment system, percolation area, new bored well, new splayed entrance and associated site work |
| 238 | Conditional | 2 Mar 2023 | 1 | 233 m | development will consist of a new two storey dwelling extending to c.235msq. The proposal also includes associated site works including a new entrance gateway and lane, a septic tank unit, associated treatment systems, new boundary fencing and hedge and required services connections |
| 21424 | Conditional | 26 May 2022 | 2 | 0 m | To construct a single storey, split level dwelling while demolishing an existing single storey dwelling, upgrading existing entrance, detached garage, new waste water treatment system, percolation area, bored well, and all associated site works |
Appeals
No appeals within 500 m in the last 5 years.
What has happened on this file
- 20 Oct 2026 New application · observations close 24 Nov 2026
- 20 Oct 2026 Decision
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 28 Oct 2026, 01:34. Not legal advice — confirm the deadline with Carlow County Council before relying on it.