The construction of a proposed four bedroom single storey dwelling house, septic tank/ filter/raised percolation area, private well, site entrance, stables, horse arena and all associated site works

Observations close 21 Dec 2026 26 days left
5 weeks from receipt (received 16 Nov 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20

The application

Reference
2660362 · full record
Authority
Carlow County Council
Type
PERMISSION
Status
INCOMPLETED APPLICATION
Site area
1.51 ha
Received
16 Nov 2026

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/CarlowCC/AppFileRefDetails/2660362/0.
  2. Write your observation.Quote 2660362 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Carlow County Council takes it online with the submission or at the counter.
  4. Submit before 21 Dec 2026.Online through the register above, or in writing to the Planning Department, Carlow County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

Designations on or near the site within 100 m

  • NIAH-recorded building × 1
    Urglin Church
  • Radon risk area × 1
    About 1 in 10 homes in this area is likely to have high radon levels
  • Recorded monument × 3
    Church · Graveyard · R145866

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2660163Conditional20 Jul 202689 m- Replacement (“restringing”) and uprating of c. 5.23km of the existing conductor on the Athy -Carlow 110 kV OHL circuit; - Provision of fibre communication connection on the uprated circuit; - Replacement of 10No. existing Intermediate Wooden Polesets, with similar structures. The replacement of these structures will result in standardised heights from 17m to 22m, with height increases between 1m and 2m. 1no. replacement Intermediate Wooden Poleset (structure 106) will be relocated approx. 21m from its current position; - Replacement of 6No. existing Intermediate Wooden Polesets crossarms; - Bar member replacements to 2No. existing steel angle masts and 1No. existing end mast; - Recapping works to be carried out on shear blocks at 2No. existing steel angle masts and 1No. existing end mast; - Foundation strengthening of 1No. existing steel angle mast and 1No. existing end mast; and, - All associated works/development including insulator/hardware replacement (strain clamps, suspension clamps and vibration dampers), replacement of bolt, replacement of line identification and danger notices, painting of angle masts, replacement/installation of anti-climbing guards, access tracks, vegetation clearance, temporary construction compounds and all other works necessary to facilitate the development. A Natura Impact Statement has been prepared and will be submitted to the planning authority with this planning application
2660550Conditional17 Jul 202689 mReplacement (“restringing”) and uprating of c.8.89km section of the conductor along the existing Athy - Carlow 110 kV OHL circuit; - Provision of fibre communication connection on the uprated circuit; - Replacement of 11No. existing Intermediate Wooden Polesets, with similar structures. The replacement of these structures will result in standardised heights from 16m to 24m, with height increases between 1m and 3m; - Replacement of 12No. existing intermediate Wooden Polesets crossarms; - Recapping works on shear blocks at 1No. existing steel angle mast; - Foundation strengthening of 1No. existing steel angle mast; - Bar member replacements to 8No. existing steel angle masts; - Separation of the existing double OHL circuit to provide for a new bypass OHL section measuring approximately 422m, connecting from the existing Athy 110 kV substation to the following proposed new structures on the existing Athy - Portlaoise 110 kV OHL: 2no. new single circuit angle masts (approximately 22.5m maximum height) and 1no. new wooden poleset (approximately 23.6m maximum height); and, - All associated works/development to existing structures, including hardware replacement (strain clamps, suspension clamps and vibration dampers), replacement of step bolts, replacement of line identification and danger notices, painting of angle masts, replacement/installation of anti-climbing guards, access tracks, vegetation clearance, temporary construction compounds and all other works necessary to facilitate the development
2560433Refused23 Feb 202610 mthe construction of a proposed four bedroom single storey dwelling house, septic tank/ filter/raised percolation area, private well, site entrance, stables, horse arena and all associated site works
2460373Refused23 Jan 202510 mis sought for new private dwelling with garage, site entrance, private well, wastewater treatment unit and percolation area, and all associated site works
2315Conditional15 Jun 2023237 mto construct a single storey dwelling, detached garage, widening of existing domestic entrance, bored well, waste treatment system & percolation area, de-commissioning of existing septic tank and all associated site works

Appeals

ACP caseTypeOutcomeDecidedDistance
317553Granted with conditions20 Mar 202437 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 16 Nov 2026 New application · observations close 21 Dec 2026
  • 16 Nov 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 24 Nov 2026, 23:00. Not legal advice — confirm the deadline with Carlow County Council before relying on it.