A roof level extension to facilitate services at existing single storey mushroom growing facility and all associated works

Observations close 4 Jan 2027 40 days left
5 weeks from receipt (received 19 Nov 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20

The application

Reference
2660369 · full record
Authority
Carlow County Council
Type
PERMISSION
Status
INCOMPLETED APPLICATION
Site area
3.06 ha
Received
19 Nov 2026

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/CarlowCC/AppFileRefDetails/2660369/0.
  2. Write your observation.Quote 2660369 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Carlow County Council takes it online with the submission or at the counter.
  4. Submit before 4 Jan 2027.Online through the register above, or in writing to the Planning Department, Carlow County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

Designations on or near the site within 100 m

  • Radon risk area × 1
    About 1 in 10 homes in this area is likely to have high radon levels

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2460196Refused24 Jul 2025289 ma 10 year planning permission on lands including Straboe and Killerig, Carlow, Co. Carlow. The development will consist of permission for a Solar PV Energy Development with associated Battery Energy Storage System Compound with a total site area of c. 132.28ha, to include solar panels mounted on steel support structures, associated cabling and ducting, inverters, transformers, switchgear substations, auxiliary transformer, permanent storage containers, monitoring houses, composting toilet, BESS customer substation, battery blocks, BESS inverters and PCS (twin skid), BESS interface cabinets (BIC), backup generator, temporary construction compounds, tracks, boundary security fencing and security gates, CCTV, landscaping and ancillary works, with a 40year operational period. It is proposed that the Proposed Development will be accessed from four separate access points which will include (i) a new access created off the R726; (ii) a new entrance off Straboe Lane; (iii) a widened and improved existing entrance off Straboe lane; and (iv) use of an existing and previously consented entrance off the R418. A Natura Impact Statement (NIS) has been submitted to the Planning Authority with the Application
23137Conditional18 Jan 20240 mto construct a boiler housing unit and Wood Chip Silo and all associated site works
22368Conditional2 Nov 20230 mfor the demolition of a wind turbine of 150kw that was erected with planning ref. number 09125 and apply for Planning Permission to erect a 500kw wind turbine, located at the south-east corner of our land, with a hub height of 65 meters and a blade diameter of 44 meters, with underground ducting connecting to existing ESB substation and all associated site works
2366Conditional13 Sept 20230 mto construct 712 no. ground mounted PV panels and all associated site works
2340Conditional18 Apr 202310 mthe development will consist of: Construction of a single storey agricultural shed building and all associated siteworks

Appeals

ACP caseTypeOutcomeDecidedDistance
323427Granted with conditions23 Mar 2026289 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 19 Nov 2026 New application · observations close 4 Jan 2027
  • 19 Nov 2026 Decision