PlanningRegister.ie
Observation pack · Cavan County Council

Corkish , Bailieborough , Co. Cavan

for the construction of a single storey detached dwelling, connection to existing public services, and associated site works

Observations close 20 Oct 2026 window closed
5 weeks from receipt (received 15 Sept 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 9 Nov 2026

The five-week window has passed. Late observations are returned unread. If the council has decided, the next door is the appeal window — but under s.37 only the applicant and those who made a valid observation may appeal.

The application

Reference
2660534 · full record
Authority
Cavan County Council
Type
PERMISSION
Status
NEW APPLICATION
Applicant
not published by the national dataset — see the council register
Units
1
Floor area
198 m²
Site area
2,697 m²
Received
15 Sept 2026
We first saw it
22 Sept 2026, 16:10
Decision due
9 Nov 2026
Decision
N/a

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/CavanCC/AppFileRefDetails/2660534/0.
  2. Write your observation.Quote 2660534 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Cavan County Council takes it online with the submission or at the counter.
  4. Submit before 20 Oct 2026.Online through the register above, or in writing to the Planning Department, Cavan County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

No current zoning polygon covers this site in the store.

Designations on or near the site

Nothing designated within 100 m of the site.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2560602Conditional1 Dec 20251444 mfor retention of a hip roof to previously approved single storey side extension (planning ref. No. 645040), rear extension, alterations and additions to elevations and all other associated site works
2560545Conditional30 Oct 20250451 mfor the retention of an existing single-storey dwelling along with all associated site works.
2560379Conditional28 Aug 20250414 mfor a 10-year duration planning permission is sought for works to upgrade the Bailieborough Wastewater Treatment Plant in the townland of Beckscourt, Bailieborough Co. Cavan. The proposed development consists of upgrades to the capacity of the existing WwTP. The proposed development consists of the following elements: (i) Demolition and replacement of existing Inlet works; (ii) SWO outfall from existing Storm Water Tank to be decommissioned; (iii) Proposed Dual Function Overflow outfall pipe connection from the WwTP inlet works to an existing drainage culvert pipeline; (iv) Provision of 1 no. new Storm Water Storage Holding Tank and associated SWO outfall pipe connection to the existing drainage culvert pipeline; (v) Provision of 1 no. aeration tank and 2 no. settlement tanks; (vi) Demolition of the existing oxidation ditch and clarifiers; (vii) Provision of below and above ground chambers (pump chambers and process drainage); (viii) Provision of service water pump sump (wash water recycle system to clean equipment); (ix) Provision of new WwTP Primary Discharge outfall pipe connection to the existing drainage culvert pipeline; (x) Provision of 1 no. picket fence thickener and mechanical dewatering unit; (xi) Provision of chemical storage and dosing equipment for alkalinity boosting, phosphorus removal and sludge treatment; (xii) Provision of 1 no. building (Sludge dewatering building) of operating equipment and 2 no. of kiosks (Intake MCC Kiosk and Aeration Tanks MCC Kiosk); (xiii) Provision of odour control unit and associated above ground ductwork; (xiv) Provision of a back-up generator with diesel tank to be used in an emergency/power cut; (xv) Provision of an ESB substation; (xvi) Demolition of the existing tanks not used in the future design (i.e., inlet works, storm tank, oxidation ditch, circular clarifier and drainage/process pump sumps, polymer preparation building, sludge blanket thickener, sludge holding tank, scum chamber and sludge dewatering kiosk); (xvii) Extension of internal access road and provision of turning head to the northern end of the site; (xviii). Ancillary and associated development including: a) Equipment lifting gantries, access platforms; b) Provision of paved/pebble area within the site; c) Landscaping works d) Replacement of site fence; e) Mechanical and electrical service connections; (xix) Installation of south facing Solar PV Panels; (xx) Retaining wall to the northern part of the site and entrance of the site. A Natura
2560373Conditional27 Aug 20251341 mfor retention consists of a detached domestic garage, two number timber garden storage sheds and all ancillary site works
2560158Conditional30 May 20251388 mto (a) demolish existing single storey rear extension (b) construct a single storey extension to the rear (c) construct a single storey extension to the side (d) planning permission is also sought to retain existing prefabricated structure on site being used as a hair salon (e) together with all associated site works
2460398Conditional24 Feb 20251140 mfor retention consists of a detached domestic garage, entrance walls, piers & gates and all ancillary site works
2460525Conditional12 Dec 20241297 mfor (1) retention of domestic garage (2) retention of extension to both sides of dwelling house and elevation changes (3) Retention of storage shed to rear of dwelling house and all ancillary site works.
22144Conditional30 May 20220425 mto retain (a) single storey extension to side of existing dwelling, (b) single storey extension to the rear of existing dwelling and (c) alterations to front elevation and all associated works

Appeals

No appeals within 500 m in the last 5 years.

What has happened on this file

  • 15 Sept 2026 New application · observations close 20 Oct 2026
  • 15 Sept 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 22 Sept 2026, 16:10. Not legal advice — confirm the deadline with Cavan County Council before relying on it.