Waste Processing and Transfer Facility , Lismagratty and Corranure Cootehill Road , Cavan Co. Cavan
For • An increase in waste acceptance of 99,000 tonnes of waste per annum. • Construction of extension of the existing Waste Processing…
For • An increase in waste acceptance of 99,000 tonnes of waste per annum. • Construction of extension of the existing Waste Processing Building to the east with 2 No. vehicular doors (7.8 m (H) x 5.7 m (W)) and 3 No. pedestrian access doors (2.1 m (H) x 1.2 m (W)). The proposed eastern extension is approximately 1,147.5 m2 in size. • Construction of extension of the existing Waste Processing Building to the north with 1 No. Roller Access Door (3.1 m (H) x 3.0 m (W)), 3 No. pedestrian access doors (2.1 m (H) x 1.2 m (W)) and an open eastern façade ((11.2 m (H) x 40.0 m (W)). The proposed northern extension is approximately 1,500 m2 in size. • Relocation of the air abatement stack to the northern façade of the proposed northern extension, stack height increased to 20.0 m. • Removal of 1 No. existing vehicular access door (c. 7.8 m (H) x 5.65 m (W)) on the southern elevation of existing Waste Processing Building. • Construction of 7 no. external storage bays on the north façade of the Waste Processing Building. • Concrete hardstanding at rear yard with an area of 3,583 m2. • Construction of a retaining wall measuring 21.2 m (L) and between 1.0 - 2.5 m in height at the north-west corner of the proposed extension to the north of the existing Waste Processing Building. • Construction of a retaining wall measuring 93.62 m (L) and between 1.0 - 6.5 m in height at the north-east corner of the rear yard, extending from the north-east corner of the proposed east extension. • Extension of existing services - the extension of storm water network will consist of the provision of gutters and channels at roof level, new down pipes on new building extensions, new carrier drains, filter drains, gulleys, slot drains and manholes in the new concrete hardstanding and new filter drains and rodding eyes to the rear of the proposed retaining walls. An extension of the existing leachate collection system, to collect and convey leachate from the proposed extensions to the existing leachate drainage network and storage tank. Existing services including drainage, water, foul, electric, communications and fire water supply will be locally lowered or moved to avoid the proposed foundations. • Replacement of 7 no. existing overnight lorry parking spaces with 7 no. car parking spaces along the eastern boundary. The proposed development will facilitate an increase in waste acceptance of 99,000 tonnes per annum, resulting in a total annual waste acceptance capacity…
The application
- Reference
- 2660650 · full record
- Authority
- Cavan County Council
- Type
- PERMISSION
- Status
- NEW APPLICATION
- Site area
- 2.21 ha
- Received
- 10 Nov 2026
- Decision due
- 13 Jan 2027
The council’s feed cuts this description short. The full text and the drawings are on the council register linked in step 1.
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/CavanCC/AppFileRefDetails/2660650/0.
- Write your observation.Quote
2660650at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Cavan County Council takes it online with the submission or at the counter.
- Submit before 15 Dec 2026.Online through the register above, or in writing to the Planning Department, Cavan County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
| Code | Objective | Plan | In force |
|---|---|---|---|
| N5 Strategic infrastructure | Integrated Waste Management Facility/Industry: Promote the development of heavy industry, infilling and integrated waste management facilities with complementary activities and uses. | cavan county development plan incorporating a local area plan for cavan town 2022 2028 | 11 Jul 2022 → 10 Jul 2028 |
| N5 Strategic infrastructure | Integrated Waste Management Facility/Industry: Promote the development of heavy industry, infilling and integrated waste management facilities with complementary activities and uses. | cavan town local area plan incorporating variation no1 2022 2028 | 11 Jul 2022 → 10 Jul 2028 |
An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.
Source: Cavan County Council development plan zoning · fetched 4 Oct 2026, 23:04
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Cavan County Council development plan zoning | — | 4 Oct 2026, 23:04 | open |
Designations on or near the site within 100 m
- Recorded monument × 1R170509
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 2460647 | Conditional | 7 May 2025 | 0 m | for: 1) Alterations to the Waste Processing Building, including: 1.1) Repositioning of the southernmost loading door at the front of the building by one bay to the left/southwest. 1.2) Construction of a below floor level outgoing loading ramp for the southernmost loading door measuring 17m (L) x 4.5m (B) x 2.15m (D). 1.3) Construction of a below floor level skip intake pit within the eastern corner of the building measuring 12.8m (L) x 12.5m (B) x 3.8m (D). 2) Extension of the Front Yard southeast by 15m. 3) Repositioning of the Site Entrance 5m south. 4) Repositioning of the Weighbridges and Weighbridge Kiosk east-northeast by up to 43m. Reconfiguration of the Weighbridge Kiosk. 5) Construction of an Entrance Ramp measuring 44.4m (L) x 14.1m (B) x 2.4m (H) from the Site Entrance to the Weighbridges. 6) Construction of a Retaining Wall measuring 44.4m (L) x 0.35m (B) x 2.7m (H) between the Front Yard and Entrance Ramp. 7) Repositioning and reconfiguration of the Administration and Welfare Facility and car parking areas. 8) Construction of a Storage Building measuring 3.0m (L) x 2.9m (B) x 2.5m (H). 9) Repositioning of the Lorry Parking Area from south boundary to the east boundary and increase in parking spaces from 9 No. to 10 No. 10) Repositioning of the Odour Control Unit 25m northeast and reconfiguration of the unit. 11) Installation of a Baler and construction of Shed Over measuring 36.2m (L) x 8.5m (B) x 13.5m (H). 12) Recontouring of an embankment area to the north of Rear Storage Yard to be level with the Rear Storage Yard covering an area of 730m². 13) Construction of a Firewater Storage Tank measuring 3m (radius) x 8.0m (H) and Pump Building measuring 12.2m (L) x 2.4m (B) x 3m (H) located within the recontoured area. 14) Repositioning of approximately 40m of northwest boundary fence by 8m inwards towards the centre of the site. 15) Repositioning of the Substation from within Waste Processing Building to 13m west outside of the building. The Substation measures 11.2m (L) x 4.4m (B) x 3.0m (H). 16) Installation of 2 No. Generators. 17) Repositioning of 2 No. diesel tanks from northeastern boundary of the Waste Processing Building to 10m west of the building. 18) Additional area of landscaping along the western boundary of the site measuring 600m². This application is accompanied by an EIA Screening Report, AA Screening Report, Planning and Environmental Report and Drawings | |
| 2460138 | Conditional | 22 Oct 2024 | 6 m | to erect a fully serviced storage extension to side of existing waste handling unit (waste permit WFP-CN-21-0003-01 relates to this facility) and all ancillary site works | |
| 2264 | Conditional | 26 Oct 2022 | 1 | 224 m | to construct detached dwelling, detached domestic garage, incorporate wastewater treatment system/percolation area, entrance walls and piers and carry out associated site works |
Appeals
| ACP case | Type | Outcome | Decided | Distance |
|---|---|---|---|---|
| 322644 | Withdrawn | 28 Jul 2025 | 0 m |
If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.
What has happened on this file
- 10 Nov 2026 New application · observations close 15 Dec 2026
- 10 Nov 2026 Decision
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 24 Nov 2026, 23:00. Not legal advice — confirm the deadline with Cavan County Council before relying on it.