PlanningRegister.ie
Observation pack · Clare County Council

Drumline , Newmarket-on-Fergus , Co. Clare

to RETAIN the change of use of store on first floor to masterbedroom with en-suite and walk-in-wardrobe. Also for RETENTION permission for rooflight on roof over stairs, 1 window to front elevation and 2 windows to rear elevation including ancillary site works

Observations close 30 Oct 2026 13 days left
5 weeks from receipt (received 25 Sept 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 19 Nov 2026

The application

Reference
2660630 · full record
Authority
Clare County Council
Type
RETENTION
Status
NEW APPLICATION
Applicant
not published by the national dataset — see the council register
Units
1
Floor area
46 m²
Site area
2,045 m²
Received
25 Sept 2026
We first saw it
30 Sept 2026, 23:22
Decision due
19 Nov 2026
Decision
N/a

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/ClareCC/AppFileRefDetails/2660630/0.
  2. Write your observation.Quote 2660630 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Clare County Council takes it online with the submission or at the counter.
  4. Submit before 30 Oct 2026.Online through the register above, or in writing to the Planning Department, Clare County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

CodeObjectivePlanIn force
O2
Green belt
Cluster: These are the smallest type of settlement in the hierarchy and their character reflects traditional building patterns with a loose collection of rural wellings, clustered around one or more focal points.drumline 1 cluster20 Apr 2023 → 19 Apr 2029

An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.

Source: Clare County Council development plan zoning · fetched 27 Sept 2026, 19:37
SourceLicenceFetchedLink
Clare County Council development plan zoning—27 Sept 2026, 19:37open

Designations on or near the site

Nothing designated within 100 m of the site.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2660256Refused15 Jun 20261198 mto construct a dwelling house, domestic garage, waste-water treatment system and soil polishing filter together with all associated site development works and connections to public services
2626Conditional27 Mar 20261279 mto change the site boundaries as granted under P99-780, demolish 2 existing on-site sheds, and to construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
2560560Refused17 Dec 20250262 mfor a proposed solar farm development which is located across the townlands of Ballycunneen, Drumline, Ballycasey More, Clonmoney West, Firgrove, and Ardkyle, in County Clare. The development will consist of: • Linear arrays of solar PV panels on ground mounted steel supported structures with associated cabling and ducting (including underground cable grid connection to the Drumline 110kV substation); • 2 no. Horizontal Directional Drilling (HDD) locations associated with interconnecting cable routes; • 11 no. proposed single storey MV stations; • A co-located Battery Energy Storage System (BESS) installation (including 20 No. containers with cells and 5no. containers with PCS MV stations); • Site perimeter fencing; • Palisade double security gates at all temporary (3No.) and permanent (3 Nno.). site entrances; • Site access tracks including passing and turning bays; • On-site pole mounted CCTV cameras; • 2no. temporary construction compound/carpark/material storage areas with associated temporary site offices, parking areas and security fencing; • 8 no. steel storage containers; • 5 no. turning bays; • 3 no. temporary construction stage wheel wash systems; • Temporary soil storage areas; and • All associated and ancillary works. The proposed solar farm development spans a total site area measuring 98ha. Permission is sought for a period of 10 years with an operational period of 40 years. The total capacity of Solar PV on the site is estimated to be up to 60MW. The development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413). x YES NO If YES above, important to note that the planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. An Appropriate Assessment Screening Report (AASR) and Natura Impact Statement (NIS) has been prepared for this development and submitted with this planning application
2560022Conditional13 Mar 20250101 mof a) retain entrance as constructed. b) PERMISSION to install roadside pipe / culvert under entrance together with all associated site development works and services
2460142Conditional21 May 20240260 mto demolish existing substandard garage and Permission for the construction of a domestic garage and store including ancillary site works

Appeals

ACP caseTypeOutcomeDecidedDistance
500676—pending22 Jan 2026262 m
500671—Invalid21 Jan 2026262 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 25 Sept 2026 New application · observations close 30 Oct 2026
  • 25 Sept 2026 Decision

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 30 Sept 2026, 23:22. Not legal advice — confirm the deadline with Clare County Council before relying on it.