Urlanmore , Newmarket-on-fergus , Co. Clare
to retain changes to building (Granted under Planning Reference Number P25/60420) as constructed, to include alterations to front elevation to include the omission of the front recess, the omission of Apex glazing to front Gable window, the omission of glazing to top & side of front door, the omission of 1 window in master bedroom. Retention permission is also sought for the omission of 2 double doors to south elevation and replacement with 1 window, the omission of corner window to south & east elevations and replacement with 1 window to east elevation including ancillary site works
The application
- Reference
- 2660645 · full record
- Authority
- Clare County Council
- Type
- RETENTION
- Status
- NEW APPLICATION
- Applicant
- not published by the national dataset — see the council register
- Units
- 1
- Floor area
- 1 m²
- Site area
- 1,171 m²
- Received
- 5 Oct 2026
- We first saw it
- 14 Oct 2026, 01:45
- Decision due
- 29 Nov 2026
- Decision
- N/a
The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/ClareCC/AppFileRefDetails/2660645/0.
- Write your observation.Quote
2660645at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Clare County Council takes it online with the submission or at the counter.
- Submit before 9 Nov 2026.Online through the register above, or in writing to the Planning Department, Clare County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
No current zoning polygon covers this site in the store.
Designations on or near the site
Nothing designated within 100 m of the site.
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 2660246 | Conditional | 9 Jun 2026 | 1 | 388 m | for the following development: (a) construction of a first floor extension to the rear of the existing dwelling. (b) construction of covered patio area to the rear of the existing dwelling. (c) changes to the internal layout of the dwelling. (d) alterations to the elevations of the existing dwelling and garage. (e) all associated site works and services |
| 2560420 | Conditional | 9 Oct 2025 | 1 | 0 m | for the construction of a dwelling house, wastewater treatment system and new entrance including ancillary site works |
| 2460413 | Conditional | 15 Jan 2025 | 0 | 430 m | for the construction of a dwelling house, wastewater treatment system and new entrance including ancillary site works |
Appeals
| ACP case | Type | Outcome | Decided | Distance |
|---|---|---|---|---|
| 500133 | — | Refused | 20 Nov 2025 | 0 m |
If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.
What has happened on this file
- 5 Oct 2026 New application · observations close 9 Nov 2026
- 5 Oct 2026 Decision
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 14 Oct 2026, 01:45. Not legal advice — confirm the deadline with Clare County Council before relying on it.