Unit 9, Exchange Business Park, Churchfield, Cork, T23F6HD
Permission to (1)sub-divide existing light industrial Unit no. 9 (458.20 sq.m)
The application
- Reference
- 26/45111 · full record
- Authority
- Cork City Council
- Type
- PERMISSION
- Status
- NEW APPLICATION
- Applicant
- Proquip Limited
- Site area
- 2,865 m²
- Received
- 20 Oct 2026
- Decision due
- 14 Dec 2026
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at https://planning.agileapplications.ie/corkcity/application-details/?ref=26/45111.
- Write your observation.Quote
26/45111at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Cork City Council takes it online with the submission or at the counter.
- Submit before 24 Nov 2026.Online through the register above, or in writing to the Planning Department, Cork City Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
| Code | Objective | Plan | In force |
|---|---|---|---|
| C2.1 Economic development and employment | Light Industry and Related Uses: To provide for light industry and related uses. | cork city development plan 2022 2028 variation no 3 npf implementation | 8 Aug 2022 → 8 Aug 2028 |
| G5 Open space and amenity | Sports Grounds and Facilities: To protect, retain and enhance the range and quality of sports facilities and grounds. | cork city development plan 2022 2028 variation no 3 npf implementation | 8 Aug 2022 → 8 Aug 2028 |
An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.
Source: Cork City Council development plan zoning · fetched 27 Sept 2026, 19:37
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Cork City Council development plan zoning | — | 27 Sept 2026, 19:37 | open |
Designations on or near the site within 100 m
- Recorded monument × 2Church · R112515
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Distance | Description |
|---|---|---|---|---|
| 2544086 | Conditional | 6 Oct 2025 | 205 m | Permission for retention of single storey extensions both to the front and rear of an existing dwelling. |
| 2543893 | Conditional | 14 Aug 2025 | 373 m | Permission for the construction of a dwelling house and all associated site development works at Sleepy Hollow, Nash's Boreen, Upper Fairhill, Garranabraher (townland) Cork. The proposed development will be accessed via a new entrance from the L-27891, Nash's Boreen. |
| 2443086 | Conditional | 22 Jan 2025 | 74 m | Permission for the redevelopment of 2 of their existing soccer playing fields, the works consists of the following, (1) Replace the existing grass pitches No.1 and No.2 with an all weather playing surface, (2) Replace the existing 4 no. floodlights to Pitch No. 1 with LED floodlighting (15m high), (3) Install 6 no. new 15m high LED flood lights to pitch No.2, (4) Construct a car parking area to the East and South East of pitch No.2, (5) Construct a spectator stand to the south of pitch No.2, (6) Construct a walkway around pitch No.2, (7) Install 2.3m high fencing around both pitches, (8) Realign the road entrance to pitch No.2, (9) Install 12 no. 6m high LED lights to the walkway and the carpark area, (10) Drainage works and all associated site works. |
| 2442920 | Conditional | 18 Nov 2024 | 488 m | Permission is sought for alterations and extension to a dwelling house, change of use and alterations to dis-used retail unit and garage store, all to be converted to 3 apartments with 2 onsite parking spaces, balcony, and all associated site works. |
| 2442800 | Conditional | 30 Sept 2024 | 128 m | Permission to increase the tonnage of construction and demolition waste recycled at our waste recycling and transfer station at Units 1-3 Churchfield Industrial Estate, John F. Connolly Road, Churchfield, Cork from 5,200 tonnes per annum to 10,400 tonnes per annum. The new development works relate to an activity requiring a waste licence. |
| 2342438 | Conditional | 20 Jun 2024 | 279 m | Permission to (1) Demolish the existing light industrial/warehouse building (2,096 sqm), (2) Construct a warehouse building (2,000 sqm) including associated service yard and parking area, (3) Carry out drainage works including the construction of a storm water attenuation tank and alterations to existing foul and storm lines, (4) Provide new boundary treatments and (5) Carry out landscaping and all associated site works. All of these relate to a site measuring 0.77 Ha. |
| 2341817 | Conditional | 7 Jun 2023 | 293 m | Permission to construct a first-floor extension to the side of the existing dwelling house to consist of a bedroom and associated site works. |
| 2241376 | Conditional | 28 Feb 2023 | 369 m | Retention permission for development at this site at: 40 Churchfield Gardens, Churchfield, County Cork, T23P7T8. The development consists of: Permission for retention of (1) A single-storey, pitched roof rear extension, (2) A single-storey, flat roof rear extension, (3) Front Portico extension, and (4) Vehicular access including entrance gates, piers, and walls to the front of existing dwelling. |
What has happened on this file
- 20 Oct 2026 New application · observations close 24 Nov 2026
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 28 Oct 2026, 23:03. Not legal advice — confirm the deadline with Cork City Council before relying on it.