Observations close 1 Oct 2026 8 days left
5 weeks from receipt (received 27 Aug 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee 20 · council decision due 21 Oct 2026

The application

Reference
26/2229 · full record
Authority
Cork County Council
Type
Permission
Status
Awaiting Recommendation
Applicant
not published by the national dataset — see the council register
Units
Floor area
Site area
3,062 m²
Received
27 Aug 2026
We first saw it
18 Sept 2026, 15:44
Decision due
21 Oct 2026
Decision
not yet decided

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at https://planning.agileapplications.ie/corkcoco/application-details/?ref=26/2229.
  2. Write your observation.Quote 26/2229 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Cork County Council takes it online with the submission or at the counter.
  4. Submit before 1 Oct 2026.Online through the register above, or in writing to the Planning Department, Cork County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

No current zoning polygon covers this site in the store.

Designations on or near the site

Nothing designated within 100 m of the site.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
26/1929Grant with conditions14 Sept 202697 mConstruction of machinery shed, and for the construction of livestock shed including underground effluent storage tank
24/6468Conditional permission14 Oct 202591 mWithin County Cork, the proposed development will consist of refurbishment works to 39.3km of overhead line, 14 no. steel towers and 204 no. wooden polesets. These lie between Knockraha Substation, in the townland of Ballynenelagh, and the border with County Tipperary in the townland of Glenduff, crossing the County Cork townlands of : Ballynanelagh, Knockraha East, Meeleen, Shanballyreagh, Barnetstown, Mitchellsfort, Meenane, Skahanagh South, Skahanagh North, Coolquane, Scartbarry, Ballyready, Ballyda, Baneena South, Lackabeha East, Hollyhill, Ballinterry, Clykeel South, Ballynanelagh, Clykeel North, Knockauduff, Ballinvarrig West, Kill-Saint-Anne South, Kill-Saint-Anne North, Ballyoran, Glenarousk, Strawhall, Ballyvadona, Carrigabrick, Gearagh, Carrigatoortane, Mountrivers, Moorepark, Ballyderown, Knockanohill, Glansheskin, Kilclogh, Macroney Upper, Castlecooke, Coolaneague, Curraghanolomer, Ballard, Curraghavoe, and Glenduff. The proposed development includes 4 no. temporary construction compounds in the townlands of Moorepark, Ballinvarrig West, Barnetstown, and Skeheen. The works in County Cork will consist of: the replacement ('restringing') of the existing overhead line (OHL) circuit conductor wires; replacement of 7 no. towers and 82 no. polesets with similar dimensions and heights as the existing; installation of 5 no. new towers and 1 new no. poleset at Barrymore Substation and the removal of 2 no. towers; installation of replacement parts on towers and polesets; foundation refurbishment/strengthening and recapping/clearing of shear blocks; all associated site development works, including temporary works areas; clearance of shear block bases; vegetation maintenance works; ancillary site preparation works, site clearance and levelling at the 4 no. temporary construction compounds, temporary works to existing tracks and new temporary access routes to each structure; and all associated works required to facilitate the proposed development. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.
24/5211Conditional permission14 Jul 202588 mPermission for 10-year permission for a solar farm consisting of solar photovoltaic panels on ground mounted frames, 4 single storey transformer stations, 4 single storey spare parts storage containers, 1 single storey MV electrical kiosk, a 38kV substation compound with 1 single storey substation building, underground electrical ducting, cabling and joint bays within the development site and within the L-1520-11, L1520-39, L-1518-0, L5789-0 and L-1517-0 public roads to connect the solar farm field parcels, a new entrance off the L-5720-11, a new entrance off the L-5170-0, upgrading of an existing agricultural entrance off the L-1520-11, internal access tracks, security fencing, CCTV, landscaping and all associated development site works at corrin, Kill Saint Anne North, Clykeel North, Ballinvarrig East, Ballinvarrig West, Deerpark, Knockaduff, Kill Saint Anne South, Ballyarra, Mohera, Spurree (townlands), Castlelyons, Fermoy, Co. Cork. The solar panels are arranged within a site area covering approximately 41.72ha, the site area within the public road is approximately 4.9ha. The total development area (including ancillary works) amounts to approximately 46.66ha. A Natrua Impact Statement (NIS) will be submitted to the planning authority with this application. The Natrua Impact Statement will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the office of the Planning Authority.
24/6366Conditional28 Mar 202540 mPermission for the construction of a rear extension to dwelling to include an attached rear granny flat, to build in existing front porch and elevational changes to existing dwelling at their property.
24/4941Conditional permission17 Jul 202497 mPermission for construction of livestock shed including underground effluent storage tank.
24/4579Refused28 May 202443 mPermission to decommission existing percolation area and install tertiary filter.
24/4574Refused28 May 20240 mPermission for construction of granny flat ancillary to main dwelling, decommission existing percolation area and installation of tertiary filter.
23/4513Conditional15 May 20238 mPermission for the construction of dwelling with garage (change of plan to part of development permitted under Pl. Reg No. 21/7448).

Appeals

ACP caseTypeOutcomeDecidedDistance
324274pending7 May 20260 m
323301Granted with conditions27 Apr 202688 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 27 Aug 2026 New application · observations close 1 Oct 2026

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 18 Sept 2026, 15:44. Not legal advice — confirm the deadline with Cork County Council before relying on it.