Lee Valley Inn, Agharinagh, Dripsey, Co. Cork
The construction of 4no. detached two storey dwellings, 1no. new shared site entrance for the provision of 10no. off street parking, the removal of the existing septic tank and the installation of 4no. new wastewater treatment units and all associated ancillary site works.
The application
- Reference
- 26/2349 · full record
- Authority
- Cork County Council
- Type
- Permission
- Status
- Awaiting Recommendation
- Applicant
- not published by the national dataset — see the council register
- Units
- —
- Floor area
- —
- Site area
- 2,381 m²
- Received
- 9 Sept 2026
- We first saw it
- 29 Sept 2026, 23:03
- Decision due
- 3 Nov 2026
- Decision
- not yet decided
The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at https://planning.agileapplications.ie/corkcoco/application-details/?ref=26/2349.
- Write your observation.Quote
26/2349at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Cork County Council takes it online with the submission or at the counter.
- Submit before 14 Oct 2026.Online through the register above, or in writing to the Planning Department, Cork County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
No current zoning polygon covers this site in the store.
Designations on or near the site
Nothing designated within 100 m of the site.
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 25/6241 | Grant with conditions | 2 Jun 2026 | — | 0 m | Permission for grannny flat ancillary to main dwelling & associated site works. |
| 25/5560 | Conditional permission | 30 Oct 2025 | — | 336 m | Permission for 1) decommissioning of existing septic tank system and upgrade/replacement with a proprietary treatment system & percolation area, 2) all associated site works |
| 24/5424 | Conditional | 7 Jan 2025 | — | 145 m | Permission Consequent on the grant of Outline Permission (Ref. No. of outline permission 21/7165): 1) Demolition of disused agricultural buildings, currently located within the confines of site no.4; 2) Construction of 4 no. new detached 2-storey dwelling houses on individual sites 1,2,3 & 4, to be served by individual waste water treatment systems; 3) Construction of new vehicular site entrances, consisting of 2 no. individual site entrances (to serve site 1 and site 4) and 1 no. shared entrance (to serve site 2 and site 3); 4) Proposed alterations to existing front boundary treatment to facilitate the provision of a new footpath along public road and public lighting; 5) All associated ancillary site development works, including new boundary treatment and landscaping works. |
| 23/5770 | Refused | 30 Sept 2024 | — | 0 m | Permission for the part demolition of the existing building, specifically the single storey extension to the side and rear of the existing building, the demolition of ancillary outhouses of the existing building, planning is also sought for construction of 4 no. detached one and a half storey dwellings, 2 no. new shared site entrances for the 4 dwelling, 6 no. off street parking, the removal of the existing septic tank and the installation of 4 no. new waste water treatment units and all associated site works |
| 24/4806 | Conditional | 21 Aug 2024 | — | 84 m | Permission for the construction of new dwellinghouse and domestic garage, new entrance, wastewater treatment system together with all other ancillary site works. |
| 23/6507 | Conditional | 23 Jul 2024 | — | 325 m | Permission for single storey extension to side of existing dormer style dwelling, internal & external alterations to existing dwelling and all associated works. |
| 23/6587 | Conditional | 30 Apr 2024 | — | 57 m | Permission to retain “Dwelling house attic development” and separate domestic garage, also permission to construct a single storey rear extension to dwelling house, with associated site works. |
| 22/5153 | Conditional | 9 May 2023 | — | 158 m | The construction of a new dweillinghouse and domestic garage, construction of new wastewater treatment system to service new dwelling, upgrading of existing entrance to shared entrance, and also upgrading of existing wastewater treatment system servicing existing dwelling together with all other ancillary site works. |
Appeals
No appeals within 500 m in the last 5 years.
What has happened on this file
- 9 Sept 2026 New application · observations close 14 Oct 2026
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 29 Sept 2026, 23:03. Not legal advice — confirm the deadline with Cork County Council before relying on it.