PlanningRegister.ie
Observation pack · Cork County Council

No. 1 Mill Reef Creek, Sleveen East, Macroom, P12 YH24

Full Planning Permission for the following - (a) permission for demolition of existing dwellinghouse, (b) permission for construction of 2 no. new two-storey dwellinghouses in lieu thereof (with changes in design and layout to that previously permitted under planning reference no. 19/5910) and (c) alter existing entrance with construction of 2 no. new entrances to the adjoining road, together with all other ancillary site works.

Observations close 29 Oct 2026 1 day left
5 weeks from receipt (received 24 Sept 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 18 Nov 2026

The application

Reference
26/2479 · full record
Authority
Cork County Council
Type
Permission
Status
Awaiting Recommendation
Applicant
not published by the national dataset — see the council register
Units
—
Floor area
—
Site area
1,035 m²
Received
24 Sept 2026
We first saw it
14 Oct 2026, 01:45
Decision due
18 Nov 2026
Decision
not yet decided

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at https://planning.agileapplications.ie/corkcoco/application-details/?ref=26/2479.
  2. Write your observation.Quote 26/2479 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Cork County Council takes it online with the submission or at the counter.
  4. Submit before 29 Oct 2026.Online through the register above, or in writing to the Planning Department, Cork County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

CodeObjectivePlanIn force
R2
Existing residential
Existing Residential/Mixed Residential and Other Uses: The scale of new residential and mixed residential developments within the Existing Residential/Mixed Residential and Other Uses within the settlement network should normally respect the pattern and grain of existing urban development in the surroundingcork county development plan 20226 Jun 2022 → 5 Jun 2028

An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.

Source: Cork County Council development plan zoning · fetched 27 Sept 2026, 19:37
SourceLicenceFetchedLink
Cork County Council development plan zoning—27 Sept 2026, 19:37open

Designations on or near the site

Nothing designated within 100 m of the site.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
25/5507Conditional permission19 Sept 2025—392 mPermission for a proposed general business unit incorporating office accommodation, with staff facilities, warehouse storage area incorporating loading bay area and service / workshop repair area, mezzanine storage area and adjusted site entrance, 1no. bicycle shelter, 1no. bin store, truck loading area, 6no. parking spaces (to include 4no. regular spaces 1no. electric charging space and 1no. disabled space) and all other ancillary and associated site development works, including landscaping.
25/4787Conditional permission3 Sept 2025—366 mPermission for single storey split level dwelling, domestic garage, sewerage system, site entrance and all associated site works.
24/5616Conditional17 Oct 2024—173 mPermission for minor modifications to planning permission ref 22/4630 in respect of the installation of a kiosk building approximately 24m2 and all associated site works
24/5201Conditional permission20 Aug 2024—249 mPermission for retention of first floor extension & alterations (including velux windows) to rear of dwelling house
23/4184Conditional8 Feb 2024—0 mPermission for the construction of 10 number detached dwelling houses, boundary walls, new entrance off existing estate road in Mill Reef Creek, new foul and surface water sewer, connection to public sewer and services, attenuation system, public lighting, and footpaths together with all other ancillary site works,
22/4630Conditional30 Mar 2023—173 mUpgrade works at the wastewater treatment plant which will consist of 1. Construction of a new storm overflow and flow splitting chamber, inlet works including grit removal system and full flow to treatment pumping station, 2 no. new integrated fixed-film activated sludge reactor tanks (Aeration Tanks), 2 no. final settlement tanks, final water sampling manhole while retaining the existing outfall to the River Sullane, return and waste activated sludge pumping stations, chemical building including lime and ferric sulphate dosing systems with bunded chemical storage tanks, 1no. storm water storage tank equipped with storm water pumps, 1 no. sludge picket fence thickener, odour control system, a sheet pile flood protection wall within the site boundary, boundary treatments include a weld mesh security fence, new internal access road and public lighting. 2. Construction of a new control and administration building. 3.Decommissioning of the existing wastewater treatment plant, equipment and associated structures as part of the upgrade works. 4. Construction of a 42 kWp photovoltaic (PV) solar panels on ground mounted frames on the north western area of the site. The PV panel shall be used to supplement the energy demands of the proposed WwTP and will be arranged with a panel area of 185sqm approximately. 5. Establishment of a designated area to be utilized by Cork County Council Roads Department and construction of a new entrance point. 6. All associated site development works above and below ground. A Natura Impact Statement (NIS) will be submitted to the planning authority with the application.
22/6039Conditional13 Feb 2023—293 mPermission for two storey extension to side and single storey extension to rear of existing two storey dwelling, internal and external alterations to dwelling, alterations to roadside boundary wall and all associated site works
22/5445Conditional11 Aug 2022—465 mPermission for construction of single storey extension to existing butchering unit and all associated site works

Appeals

No appeals within 500 m in the last 5 years.

What has happened on this file

  • 24 Sept 2026 New application · observations close 29 Oct 2026

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 14 Oct 2026, 01:45. Not legal advice — confirm the deadline with Cork County Council before relying on it.