PlanningRegister.ie
Observation pack · Cork County Council

Inchiroe, Cloghboola, Cornery, Tooreenalour, Gortnacarriga, Cooragreenane, Curraheen, Cappanclare, Coorolagh, Gortneadin, Inchincurka, Castlemore and Bengour East.,

The development will consist of: · Works at 20 No. locations along the Turbine Delivery Route (TDR) to facilitate abnormal loads for the delivery of turbine components to the Gortloughra Wind Farm. The works will consist of the creation of the overrun areas into third party lands at various locations. These works can be reinstated on completion of the turbine deliveries or left in-situ with the agreement of the landowners and Cork County Council. The parapets of 2 no. bridges on the L8544 and the L4607 will need to be temporarily lowered to allow abnormal vehicles to cross those bridges. · Temporary works at 2 No. locations on the R585 where blade handover locations will be developed to allow the transfer of turbine blades to and from a blade lifter trailer to facilitate the transport of oversize turbine blades through the village of Crookstown. Works will involve the creation of 2 site entrances at each location for access and egress purposes and the laying of hardcore material to allow vehicles to enter the sites and transfer blades between trailers. A 10 year permission and a 2 year operational period from the construction of the works is being sought.

Observations close 29 Oct 2026 window closed
5 weeks from receipt (received 24 Sept 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 18 Nov 2026

The five-week window has passed. Late observations are returned unread. If the council has decided, the next door is the appeal window — but under s.37 only the applicant and those who made a valid observation may appeal.

The application

Reference
26/2484 · full record
Authority
Cork County Council
Type
Permission
Status
Invalid - Case Closed
Applicant
not published by the national dataset — see the council register
Units
—
Floor area
—
Site area
4.77 ha
Received
24 Sept 2026
We first saw it
14 Oct 2026, 01:45
Decision due
18 Nov 2026
Decision
not yet decided

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at https://planning.agileapplications.ie/corkcoco/application-details/?ref=26/2484.
  2. Write your observation.Quote 26/2484 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Cork County Council takes it online with the submission or at the counter.
  4. Submit before 29 Oct 2026.Online through the register above, or in writing to the Planning Department, Cork County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

No current zoning polygon covers this site in the store.

Designations on or near the site

  • Recorded monument × 4
    Fulacht fia · Megalithic tomb - wedge tomb · R107373

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
26/1283Grant with conditions7 Sept 2026—481 mPermission for dwelling house, sewage treatment system, domestic garage and all associated site works.
25/6711Grant with conditions9 Feb 2026—68 mFull Planning Permission for the demolition of existing extensions to the rear and side elevations of existing dwellinghouse along with Full Planning Permission for alterations, elevational changes and construction of extension to rear and side elevations of existing dwellinghouse, decommissioning of existing septic tank and installation of new wastewater treatment system, together with all other ancillary site works
25/142Refused14 May 2025—0 mErection of eight wind turbines with an overall ground to blade tip height of 175m consisting of a rotor diameter of 150m; and a hub height of 100m, Construction of permanent Turbine hardstands and Turbine Foundations, Construction of one temporary Construction Compound with associated temporary site offices parking areas and security fencing, Installation of meteorological mast with a height of 100m, Development of one on-site Borrow pit, Construction of new permanent internal site access roads and upgrade of existing internal site access roads to include passing bays and all associated drainage infrastructure, Development of a permanent internal site drainage network and sediment control systems, All associated underground electrical power and communications cabling connecting the wind turbines to the on-site substation, Biodiversity enhancement measures. Recreational community improvements including the erection of 4 no. permanent information boards relating to cultural heritage and upgrades to amenity tracks across the site, all associated site development works
25/4451Conditional permission2 May 2025—447 mPermission for dwelling, sewage treatment system, domestic garage & all associated site works
23/6095Conditional7 Dec 2023—304 mConstruction of dwelling house detached domestic garage, installation of waste water treatment system & for all associated site works.
23/5286Conditional17 Aug 2023—376 mPermission for retention for existing dwelling house, existing site entrance and driveway, and all completed site works as constructed. Permission is also sought for decommission of existing septic tank and installation of new waste water treatment unit to serve existing dwelling on site, and all associated site works
22/5331Conditional8 Sept 2022—442 mPermission for construction of a new two storey dwelling house with habitable attic space, detached domestic garage, new domestic entrance off the public road, wastewater treatment system & distribution system and all ancillary site works & services.
22/5148Conditional11 Jul 2022—9 mPermission for retention of: a) dwelling as constructed (including raising of ridge height and first floor conversion - previous ref. 02/5181), b) domestic garage as constructed (larger footprint - previous ref. 04/7001), and for permission for : 1) re-located proprietary treatment system (to serve existing dwelling) in place of existing septic tank and 2) altered site boundaries.

Appeals

ACP caseTypeOutcomeDecidedDistance
322743—pending10 Jun 20250 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 24 Sept 2026 New application · observations close 29 Oct 2026

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 14 Oct 2026, 01:45. Not legal advice — confirm the deadline with Cork County Council before relying on it.