Dromskarragh Beg, Kiskeam, Mallow, Co. Cork.
Permission to construct a new dwelling house.
The five-week window has passed. Late observations are returned unread. If the council has decided, the next door is the appeal window — but under s.37 only the applicant and those who made a valid observation may appeal.
The application
- Reference
- 26/2516 · full record
- Authority
- Cork County Council
- Type
- Permission
- Status
- Awaiting Recommendation
- Applicant
- not published by the national dataset — see the council register
- Units
- —
- Floor area
- —
- Site area
- 3,370 m²
- Received
- 29 Sept 2026
- We first saw it
- 14 Oct 2026, 01:45
- Decision due
- 23 Nov 2026
- Decision
- not yet decided
The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at https://planning.agileapplications.ie/corkcoco/application-details/?ref=26/2516.
- Write your observation.Quote
26/2516at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Cork County Council takes it online with the submission or at the counter.
- Submit before 3 Nov 2026.Online through the register above, or in writing to the Planning Department, Cork County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
No current zoning polygon covers this site in the store.
Designations on or near the site
- Recorded monument × 1R111283
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 23/6126 | Conditional | 15 May 2024 | — | 268 m | A) Construct a storey and a half extension with a single storey flat roof link style extension to the side of the existing dwelling. B) Renovate the existing dwelling and to allow for elevational changes C) Decommission the existing septic tank and install a new tertiary treatment system and infiltration area. D)Alterations to roadside boundary. E) All associated site works. |
| 23/5659 | Conditional | 1 Feb 2024 | — | 302 m | The development will consist of; a) Renovations to existing dwelling house and extension to rear of existing dwelling house, b) demolition of existing defective roofs and replace same with new, c) demolition of structurally defective rear and gable wall, d) alterations to all elevations including revised window and door locations, e) remove existing mobile home, f) retain existing front projection to existing dwelling house, along with all ancillary site works. |
Appeals
No appeals within 500 m in the last 5 years.
What has happened on this file
- 29 Sept 2026 New application · observations close 3 Nov 2026
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 14 Oct 2026, 01:45. Not legal advice — confirm the deadline with Cork County Council before relying on it.