PlanningRegister.ie
Observation pack · Cork County Council

Roosdoon, Reen Meen East, Grengarriff,, Co. Cork, P75 FC61

i) Demolition of existing two-storey dwelling and external stores; ii) Construction of two-storey replacement dwelling, incorporating south, east and west facing terraces; iii) Construction of open garage and bike/bin store with sedum roof; iv) Landscaping works, including localised regrading, removal of non-viable trees, and restoration, replanting of existing gardens and make good existing path around the site; v) Connection via pumped discharge to Uisce Eireann foul sewer on N71, including provision of pipework along the access road and construction of an outfall manhole at edge of public road; and vi) all other associated ancillary site works.

Observations close 3 Nov 2026 12 days left
5 weeks from receipt (received 29 Sept 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 23 Nov 2026

The application

Reference
26/2526 · full record
Authority
Cork County Council
Type
Permission
Status
Invalid - Prepare Letters
Applicant
not published by the national dataset — see the council register
Units
—
Floor area
—
Site area
5,992 m²
Received
29 Sept 2026
We first saw it
14 Oct 2026, 01:45
Decision due
23 Nov 2026
Decision
not yet decided

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at https://planning.agileapplications.ie/corkcoco/application-details/?ref=26/2526.
  2. Write your observation.Quote 26/2526 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Cork County Council takes it online with the submission or at the counter.
  4. Submit before 3 Nov 2026.Online through the register above, or in writing to the Planning Department, Cork County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

No current zoning polygon covers this site in the store.

Designations on or near the site

Nothing designated within 100 m of the site.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
26/1924Grant with conditions10 Sept 2026—57 mPermission for (1) construction of a garage (2) retention of rear extension (3) retention of alterations to elevations from those granted under 15/173
25/6921Grant with conditions23 Mar 2026—116 mpermission for decommissioning of existing septic tank system serving dwelling house and installation of new replacement septic tank and percolation area
25/308Grant with conditions16 Mar 2026—385 mPlanning Permission for extension of existing filling station retail shop premises to provide toilet facilities, storage, food prep. serving and sit down area for customers and all associated site works
25/6685Conditional permission4 Feb 2026—395 mReplacement of existing tubular handrail to external access stairway and landing, including a refuge area to first floor apartment, plus all associated ancillary site works as per the documents and drawing submitted with this application
25/305Conditional permission11 Nov 2025—0 mDevelopment will consist of the following: i) Demolition of existing two-storey dwelling and external stores; ii) Construction of two-storey replacement dwelling, incorporating south and west facing terraces; iii) Construction of open garage, iv) Landscaping works, including localised regrading, removal of non-viable trees, and restoration and replanting of existing gardens; v) Connection via pumped discharge to Uisce Eireann foul sewer on N71, including provision of pipework along the access road and construction of an outfall manhole at edge of public road; and vi) all other associated ancillary site works
25/145Conditional12 May 2025—170 mPlanning Permission for retention of 1. Retention of alterations to fenestration of studio. 2. Retention of alterations to fenestration of dwelling. Permission is also sought for removal of roof dormer, re-slating of roof, installation of rooflights and all associated site works
24/625Conditional18 Apr 2025—235 m(1) Permission for retention for changes to the design of the dwelling house granted under Cork County Council Ref. No. 90/3755 including the following: (i) the use of dwelling house to include short-term letting ; (ii) amendments to the permitted dwelling to provide for a 2 storey dwelling house with 2 no. living areas, 3 no. kitchen/dining areas, 2 no. bedrooms with en-suites, a conservatory, a games room, a sauna, WC and storage areas at ground floor level; (iii) 9 no. bedrooms (3 with en-suites) and 4 WC's at first floor level; (iv) the provision of 1 no. laundry building with a laundry room, kitchen and WC at ground floor level and a bedroom and linen store at first floor level (v) 1 no. boiler house, and (2) Permission for the decommissioning of existing septic tank and the construction of a new wastewater treatment unit and all ancillary site development works
25/81Conditional16 Apr 2025—428 mPermission for retention and permission for completion of dwelling under construction (revised design to that permitted under Pl Reg No. 22/504) and all associated site works

Appeals

No appeals within 500 m in the last 5 years.

What has happened on this file

  • 29 Sept 2026 New application · observations close 3 Nov 2026

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 14 Oct 2026, 01:45. Not legal advice — confirm the deadline with Cork County Council before relying on it.