PlanningRegister.ie
Observation pack · Cork County Council

Baile Iarthach Thuaidh, Oileán Chléire, Sciobairín, Co. Chorcaí

Dealbh adhmaid a chur in airde ag an laronad oidhreachta reatha ag Oilean Chleire, Co Choreal. San aireamh sna hoibreacha mollta beidh dealbh shnoite shaorsheasaimh adhmaid (timpeall 3.7m ar airde) a chur in airde, bonn treisithe coincreit a insealbhu agus na hoibreacha gaolmhara agus coimhdeacha suimh ar fad..

Observations close 11 Nov 2026 20 days left
5 weeks from receipt (received 7 Oct 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 1 Dec 2026

The application

Reference
26/2600 · full record
Authority
Cork County Council
Type
Permission
Status
Awaiting Recommendation
Applicant
not published by the national dataset — see the council register
Units
—
Floor area
—
Site area
25 m²
Received
7 Oct 2026
We first saw it
21 Oct 2026, 02:10
Decision due
1 Dec 2026
Decision
not yet decided

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at https://planning.agileapplications.ie/corkcoco/application-details/?ref=26/2600.
  2. Write your observation.Quote 26/2600 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Cork County Council takes it online with the submission or at the counter.
  4. Submit before 11 Nov 2026.Online through the register above, or in writing to the Planning Department, Cork County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

No current zoning polygon covers this site in the store.

Designations on or near the site

  • Recorded monument × 3
    Graveyard · Church · R105671

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
25/6833Grant with conditions16 Jun 2026—0 mÁireofar ar na hoibreacha atá beartaithe míonathraithe inmheánacha, tógáil síneadh de bhloc leithris (10.0m2), forsheomra iontrála gloinithe agus limistéar clúdaithe taobh amuigh, lánchóras cóireála fuiolluisce nua a chur in ionad an chórais cóireála fuíolluisce agus limistéar síothlaithe atá ann cheana, soláthar treochomharthaíochta bealaí, insealbhú múrphictiúr ballaí agus gach obair ghaolmhar. Tá Ráiteas Tionchair Natura (NIS) ullmhaithe agus beidh sé á chur ar aghaidh i dteannta an iarratais pleanála chuig an Údarás Pleanála
23/151Conditional27 Sept 2023—23 mchun athruithe bunísacha agus athchóiriú ar Aonad 1, stór mar atá, a chur in oiriúint lena úsáid mar iarsmalan ag ionchorprú eispeárachas 360 an Charraig Aonar agus leithris chomh maith le gach cineál oibreacha coimhdeach a bhaineann leis. The change of use and alterations to Unit 1, existing store, for use as a museum incorporating a Fastnet Rock 360 visual experience and toilets, as well as all associated works
23/385Conditional1 Sept 2023—11 mchun athruithe ábhartha ar na hingearchlónna, ballaí agus díon an tseid a fuair cead pleanála Uimhir 22/719, le hagaidh dhlúthadóiur agus ábhair in-athchúrsáilte a stóráil chomh maith le gach cineál oibreacha coimhdeach a bhaineann leis. Material alterations to the elevations, walls and roof of shed granted planning permission Number 22/719, for a compactor and storage of bales of recyclable materials, as well as all associated works
23/374Conditional29 Aug 2023—327 mChange of use of former beer store to off-licence and associated site development works
23/139Conditional permission5 May 2023—11 mChun talún a fhorbairt agus é a chur in oiriúint lena úsáid mar Chlós Spraí, chomh maith le gach cineál oibreacha coimhdeach a bhaineann leis. Development of land for use as a playground, as well as all associated works
22/438Refused13 Apr 2023—379 mDhá thig cónaithe a thógáil, aonad uisce truillithe agus obair suíomhe chuI, agus dhá dabhach séarchais a bhaineann le dhá thig sa timpeallacht a bhaint as úsáid, agus na tithe seo a cheangailt isteach san aonad uisce thuillithe nua. Construction of two number dwelling houses, wastewater water treatment system and all associated site development works also permission for the decommissioning of existing septic tanks for two adjacent dwelling houses and re-connection to the proposed wastewater system.
22/719Conditional27 Jan 2023—11 mchun seid nua a thogáil agus é a chur in oiriúint lena úsáid mar seid dhlúthadóiur agus le haghaidh burlaí ábhair in-athchúrsáilte a stóráil, chomh maith le gach cineál oibreacha coímdeach a bhaineann leis. For construction of new shed for use as a compactor shed and for storage of bale of recyclable materials, as well as all associated works.
22/654Conditional8 Dec 2022—5 mIarratas cead pleanála chun athruithe ábhartha a dhéanamh ar ingearchlónna seachtracha, oibreacha láithreáin agus leithris; chun athrú úsáide agus athruithe bunúsacha agus athchóiriú a choinneáil agus chríochnú chun seomra Naíonra a chur in oiriúint lena úsáid mar GTeic agus Stór Chartlanna chun seomra Ceardlanna a chur in oiriUint le leagan amach nua lena úsid mar Oifig 1 & Seomra Tae, Oifig 2, Seomra Níochán agus Leabharlann Poiblí; chun athruithe ar chlaonna a choinneáil; chun athruithe ábhartha chun na rialacháin tógála a chomhlíonadh a chríochnú agus ag cur san áireamh na hoibreacha coimhdeacha láithreáin ar fad ag Aonad 2 Ar Son Údarás na Gaeltachta. (Planning application for permission to make material alterations to external elevations, siteworks and toilets; for retention and completion of material alterations and changes of use from Naoinra to GTeic and Archive Store, from workshop to new layout with rooms for use as Office 1 & Tea Room, Office 2, Laundry and public Library; for retention of elevation changes; for completion of material alterations to comply with building regulations and incorporating all associated siteworks at Unit 2)

Appeals

No appeals within 500 m in the last 5 years.

What has happened on this file

  • 7 Oct 2026 New application · observations close 11 Nov 2026

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 21 Oct 2026, 02:10. Not legal advice — confirm the deadline with Cork County Council before relying on it.