PlanningRegister.ie
Observation pack · Cork County Council

Desert, Clonakilty, Co. Cork

Construction of a single storey dwelling house, waste water treatment system, percolation area and ancillart site works (Change of Plan 23/336)

Observations close 12 Nov 2026 23 days left
5 weeks from receipt (received 8 Oct 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 2 Dec 2026

The application

Reference
26/2610 · full record
Authority
Cork County Council
Type
Permission
Status
Awaiting Admin Validation
Applicant
not published by the national dataset — see the council register
Units
—
Floor area
—
Site area
4,263 m²
Received
8 Oct 2026
We first saw it
14 Oct 2026, 01:45
Decision due
2 Dec 2026
Decision
not yet decided

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at https://planning.agileapplications.ie/corkcoco/application-details/?ref=26/2610.
  2. Write your observation.Quote 26/2610 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Cork County Council takes it online with the submission or at the counter.
  4. Submit before 12 Nov 2026.Online through the register above, or in writing to the Planning Department, Cork County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

CodeObjectivePlanIn force
R2
Existing residential
Existing Residential/Mixed Residential and Other Uses: The scale of new residential and mixed residential developments within the Existing Residential/Mixed Residential and Other Uses within the settlement network should normally respect the pattern and grain of existing urban development in the surroundingcork county development plan 20226 Jun 2022 → 5 Jun 2028

An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.

Source: Cork County Council development plan zoning · fetched 27 Sept 2026, 19:37
SourceLicenceFetchedLink
Cork County Council development plan zoning—27 Sept 2026, 19:37open

Designations on or near the site

Nothing designated within 100 m of the site.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
26/0256Grant with conditions2 Apr 2026—338 mUniversal Access Works within the relevant part of the existing school comprising of alterations and upgrade works at all levels including new windows, construction of single story extensions to front and rear at lower ground floor level, construction of an external lift enclosure at upper floor levels, construction of an external universal access route within the school grounds, minor modifications to the existing playgrounds and all associated site works. St. Josephs Girls National School shares a boundary with the curtilage of Sacred Heart Secondary School, a Protected Structure, and has a right of way for access within this curtilage
26/0031Grant with conditions9 Mar 2026—408 mPermission for the upgrade of an existing waste hold enclosure for the storage of clinical waste and to support the housing of a proposed new bio-digester at location A. The demolition of the existing waste hold in location A and works to provide a separate enclosure to house waste bins and bottle gases at location B together with all associated site development works. The proposed development is within the curtilage of a protected structure RPS01668
25/5874Refused5 Nov 2025—139 mConstruction of 4 detached dwellings with associated domestic garages, new roadway, entrance to highway, drainage and landscaping works
24/624Conditional27 Mar 2025—485 mChange of use from existing commercial unit to residential house, along with all associated site works
24/460Conditional10 Mar 2025—402 mDecarbonisation and Thermal Energy Upgrade works comprising: 1. Energy Centre redevelopment and extension including demolition of a disused boiler chimney and associated ancillary structures to facilitate heat pump and geothermal energy installations and construction of associated plant enclosures, site services and site works, 2. Window replacement, external insulation and render to some buildings, 3. Roof upgrade works to some buildings, 4. PV panel installation to some roofs excluding protected structures, 5. Ground mounted PV panel installation and associated site services and site works. The proposed development is within the curtilage of a protected structure RPS 01668
24/4989Refused19 Jul 2024—415 mPermission for the construction of a single storey dwelling house, integrated garage, new vehicular entrance, connection to public services and all ancillary site works.
23/660Conditional23 Jan 2024—201 m(i) ground floor extension to north-east (rear) elevation, (ii) ground floor extension to north-west (side) elevation, (iii) minor elevational changes to a number of existing window and external door openings to include the construction of two new window openings at first floor level on the north-east elevation together with all associated alterations and site works
23/336Conditional permission18 Sept 2023—0 mConstruction of single storey style dwelling house waste water treatment system, percolation area and ancillary site works

Appeals

ACP caseTypeOutcomeDecidedDistance
320568—Refused9 Jul 2025415 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 8 Oct 2026 New application · observations close 12 Nov 2026

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 14 Oct 2026, 01:45. Not legal advice — confirm the deadline with Cork County Council before relying on it.