Glanagow and Corkbeg (townlands),, Whitegate, Co. Cork,, within a total site area of 3.21 hectares within the curtilage of the Whitegate Power Station.

The proposed development will consist of a 10-year permission for the construction of a Battery Energy Storage System (BESS) facility comprising of 80 containerised lithium-ion BESS units on skids, 20 MV Skids, a 220kV transformer compound including a 220kV transformer and associated fire wall, one single-storey Control Room Building (approximately 87m2 gross floor area) one single-storey MV Switchroom Building (approximately 87m2 gross floor area), an auxiliary transformer, grid equipment container (approximately 15m2 gross floor area), back-up diesel generator (approximately 15m2 gross floor area), associated outdoor electrical plant, underground cabling, internal access tracks, boundary fencing, CCTV, lighting, lightning masts, and all other associated site and development works. The proposed development will be co-located with a Synchronous Condenser facility permitted under Planning Ref: 25/6422 and will consist of minor modifications to the configuration of the permitted internal access tracks to accommodate both developments. All works will take place on lands at Glanagow and Corkbeg (Townlands), Whitegate, Co. Cork.

Observations close 13 Nov 2026 8 days left
5 weeks from receipt (received 9 Oct 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 3 Dec 2026

The application

Reference
26/2621 · full record
Authority
Cork County Council
Type
Permission
Status
Awaiting Recommendation
Applicant
not published by the national dataset — see the council register
Units
—
Floor area
—
Site area
3.24 ha
Received
9 Oct 2026
We first saw it
28 Oct 2026, 01:34
Decision due
3 Dec 2026
Decision
not yet decided

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at https://planning.agileapplications.ie/corkcoco/application-details/?ref=26/2621.
  2. Write your observation.Quote 26/2621 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Cork County Council takes it online with the submission or at the counter.
  4. Submit before 13 Nov 2026.Online through the register above, or in writing to the Planning Department, Cork County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

CodeObjectivePlanIn force
C2.1
Economic development and employment
Industry: Promote the development of industrial areas as the primary location for uses that include heavy industry, manufacturing, repairs, medium to large scale warehousing and distribution, biomedical, pharmaceutical, bioenergy plants, open storage etccork county development plan 20226 Jun 2022 → 5 Jun 2028

An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.

Source: Cork County Council development plan zoning · fetched 27 Sept 2026, 19:37
SourceLicenceFetchedLink
Cork County Council development plan zoning—27 Sept 2026, 19:37open

Designations on or near the site

  • Recorded monument × 3
    Fulacht fia · Fulacht fia · Kiln - corn-drying

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
25/6422Grant with conditions13 Jan 2026—0 mBord Gáis Energy Limited intend to apply for planning permission for development at Glanagow and Corkbeg (townlands), Whitegate, Co. Cork, within a total site area of 3.15 hectares within the curtilage of the Whitegate Power Station. The proposed development consists of a 10 year Planning Permission for a Grid Stability Service Development including the provision of a synchronous condenser enclosed within a building of approximately 552m² gross floor area and approximately 12.1 metres in height, associated plant and apparatus including 8 no. modular electrical control containers with a combined gross floor area of approximately 238m², 3 no. transformers, external cooling equipment, an external circuit breaker, fuel tank and containerised emergency diesel generator with a gross floor area of approximately 30m². The proposed development also seeks permission for the provision of a 220kV electrical cabling connection to the nearby Glanagow 220kV substation, lightning protection masts, lighting, security fencing, the provision of a new access track and localised widening of existing access road, the removal of 4 no. existing modular buildings (currently in use as offices, staff and storage facilities) and associated foundations, and all associated ancillary site and development works.

Appeals

No appeals within 500 m in the last 5 years.

What has happened on this file

  • 9 Oct 2026 New application · observations close 13 Nov 2026