Crushyriree, Glanmire, Co. Cork, T45TW77
a) Construction of a roof over existing unroofed slatted tanks and cubicles b) Construction of an agricultural building consisting of cubicles and calf rearing pens c) Construction of an underground slatted slurry storage tank d) Demolition of existing loose houses and storage buildings and all associated siteworks
The application
- Reference
- 26/2698 · full record
- Authority
- Cork County Council
- Type
- Permission
- Status
- Awaiting Recommendation
- Applicant
- not published by the national dataset — see the council register
- Units
- —
- Floor area
- —
- Site area
- 1.53 ha
- Received
- 19 Oct 2026
- We first saw it
- 3 Nov 2026, 23:01
- Decision due
- 14 Dec 2026
- Decision
- not yet decided
The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at https://planning.agileapplications.ie/corkcoco/application-details/?ref=26/2698.
- Write your observation.Quote
26/2698at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Cork County Council takes it online with the submission or at the counter.
- Submit before 23 Nov 2026.Online through the register above, or in writing to the Planning Department, Cork County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
No current zoning polygon covers this site in the store.
Designations on or near the site
Nothing designated within 100 m of the site.
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 26/1300 | Grant with conditions | 20 Aug 2026 | — | 11 m | Permission for construction of a single-storey extension to the front of the existing dwelling. Alterations to southwest elevation of existing dwelling, together with all associated site works and ancillary services. |
| 25/5360 | Grant with conditions | 25 Mar 2026 | — | 456 m | Permission to construct a new heavy goods vehicle service and repair workshop building with offices, toilets and canteen, parking area for vehicles, bicycles and motorcycles, and all associated site and ancillary works |
| 25/4860 | Conditional | 30 Jun 2025 | — | 415 m | Permission for construction of a 550.85 sq.m extension of the existing workshop and for elevational changes to the existing workshop and for elevational changes to the existing building. The extension will consist of a new workshop area, administrative spaces and welfare facilities. The elevational alterations will consist of the upgrade of the external cladding to the existing workshop building. In addition, new signage will be added to the northern elevation. The works also include the removal of temporary site installations, provision of drainage and all associated site development works. |
Appeals
No appeals within 500 m in the last 5 years.
What has happened on this file
- 19 Oct 2026 New application · observations close 23 Nov 2026
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 3 Nov 2026, 23:01. Not legal advice — confirm the deadline with Cork County Council before relying on it.