Brickfields Park, off Slievenamon Road, Drimnagh, Dublin 12
LAW:Planning and Development Act 2000 (as amended) Planning and Development Regulations 2001 (as amended) - Part 8 Pursuant to the requirements of the above, notice is hereby given of the proposed construction by Dublin City Council of new Sports Changing Building, fence enclosures, landscape works and alterations to the park entrance gates in the above location. The demolition of the existing changing buildings, all-weather pitch, fence enclosures and the construction of a new Sports Changing Building, new flood lit 7 aside all-weather pitch with enclosing fencing to replace the existing all weather pitch; fence enclosures and landscape works. The works also include alterations to the main park entrance at Slievenamon Road comprising the removal of double gates and replacement with single gate, removal of single side gate and replacements with double gates. The proposal has undergone Appropriate Assessment Screening in accordance with Article 6(3) of the Habitats Directive (92/43/EEC) and screening for Environmental Impact Assessment under the EIA Directive 2011/92/EU, as amended by Directive 2014/52/EU. In accordance with Article 81 of the Planning & Development Regulations 2001, as amended, the Planning Authority has made a determination and concluded that: a) The proposed development, either individually or in combination with other plans and projects, is not likely to have a significant effect on any European site(s) and therefore a Stage 2 Appropriate Assessment is not required. b) There is no real likelihood of significant effects on the environment arising from the proposed development and that the proposed development is not of a class set out under Schedule 5 of the Planning and Development Regulations 2001, as amended, and therefore does not require an Environmental Impact Assessment Report (EIAR). Any person may, within 4 weeks from the date of publication of this notice, apply to An Coimisiún Pleanála for a screening determination as to whether the development would be likely to have significant effects on the environment Plans and Particulars of the proposed development may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy for a period of 4 weeks from 13/11/2026 during public opening hours at the offices of Dublin City Council, Public Counter, Planning and Property Development Department, Block 4, Ground Floor, Civic Offices, Wood Quay, Dublin 8, Monday - Friday 9.00am to 4.30pm (and other location if applicable). The plans and particulars are also available for inspection online: https://engage.dublincity.ie/en-IE/ on the City Council’s website www.dublincity.ie A submission or observation in relation to the proposed development, dealing with the proper planning and sustainable development of the area in which the development would be situated, may be made, in writing, to the Executive Manager, Planning and Property Development Department, Dublin City Council, Civic Offices, Wood Quay, Dublin 8, before 4.30pm on 05/ 01/ 2027. Submissions or observations may also be made online https://engage.dublincity.ie on the City Council’s website www.dublincity.ie before 23.59hrs on 05/ 01/ 2027…
The application
- Reference
- 5245/26 · full record
- Authority
- Dublin City Council
- Type
- Local Authority Works
- Status
- Registered Application
- Applicant
- Dublin City Council
- Received
- 16 Nov 2026
The council’s feed cuts this description short. The full text and the drawings are on the council register linked in step 1.
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at https://planning.agileapplications.ie/dublincity/application-details/?ref=5245%2F26.
- Write your observation.Quote
5245/26at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Dublin City Council takes it online with the submission or at the counter.
- Submit before 21 Dec 2026.Online through the register above, or in writing to the Planning Department, Dublin City Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
| Code | Objective | Plan | In force |
|---|---|---|---|
| Zone Z14 - DEV PLAN 2022-2028 | Dublin City Council development plan | ||
| R3 Rural cluster | Z14: Strategic Development and Regeneration Areas (SDRAs): To seek the social, economic and physical development and/or regeneration of an area with mixed-use, of which residential would be the predominant use. | development plan 2022 2028 | 14 Dec 2022 → 31 Dec 2028 |
| R3 Rural cluster | Z14: Strategic Development and Regeneration Areas (SDRAs): To seek the social, economic and physical development and/or regeneration of an area with mixed-use, of which residential would be the predominant use. | development plan 2022 2028 variation no 11 | 14 Dec 2022 → 31 Dec 2028 |
An application that accords with the zoning objective is hard to resist on principle; one that does not may be a material contravention, which the council can only grant by the s.34(6) procedure with its own notice and window.
Source: Dublin City Council development plan zoning · fetched 4 Oct 2026, 23:04
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Dublin City Council development plan zoning | — | 4 Oct 2026, 23:04 | open |
Designations on or near the site within 100 m
- Radon risk area × 1About 1 in 20 homes in this area is likely to have high radon levels
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| WEB3149/26 | Refuse permission | 22 Oct 2026 | 0 m | Conversion of existing attic space comprising of modification of existing roof structure, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear. ______________________________________________________________________________ | |
| WEB1983/26 | Grant permission | 27 Jul 2026 | 432 m | I Zhendong Li intend to apply for full planning permission for the following works 1: Removal of side entrance wall and building a new two storey side extension with a side gate to enclosed side entrance 2: Moving of front entrance door from the side to the front of the house 3: Alteration and extending existing converted attic space as part of new side two storey extension including widening existing rear dormer window and linking of same into the rear flat roof section of the new two storey side extension, and placing 4 new Velux windows in main roof to front (2 in existing main roof and 2 in new side two storey extension roof) 4: All associated site works at 1 Walkinstown Avenue , Dublin 12 , D12A2T7 | |
| WEB2664/26 | Application declared invalid | 7 Jul 2026 | 435 m | We, InstaVolt Europe Limited, intend to apply for planning permission for development at the site: McDonald’s, Kylemore Rd, Naas Rd, Inchicore, Dublin, D12 P6R6. The development will consist of the installation of 2 no. electric vehicle (EV) chargers, ancillary equipment and all associated site development works. | |
| WEB2551/26 | Application declared invalid | 25 Jun 2026 | 30 m | We, O’Flynn Construction Co. Unlimited Company intend to apply to Dublin City Council for permission for development at this c. 1.86-hectare site, part of the ‘Nissan Site’, to the east of Walkinstown Avenue at the junction of Walkinstown Avenue and Naas Road. The development will consist of amendments to a previously permitted (Reg. Ref. 3228/20, as amended by Reg. Refs. 3792/23 and WEB5179/25) mixed-use development. The development will consist of: I. Amendments to the basement with subsequent reduction of 47 sq.m. gross floor area. The amendments include combining bin storage areas, removal of a water storage tank, changes to vent sizes and locations, changes to and consolidation of plant room layouts, and revised lift/stair core and lobby layouts. II. Amendments at roof-level, including:a.Removal of previously permitted plant structures on Blocks F, G & K. b.Provision of safety railings, approximately 1.8 m above roof level, to accessible roof terraces on Blocks F, J, K, and L. c.Reduction in the extent of roof-mounted photovoltaic (PV) solar panels across Blocks I, J, and L due to the use of more efficient panels. III. Amendments to individual blocks, including: a. Block F: Increase in the overall building height by 0.76m. Building setback by 0.35m and central balconies recessed along the western façade to avoid encroachment into the ESB exclusion zone. Balconies on the apartments at the northwest corner on the western façade will be relocated to the northern façade to avoid extending into the ESB exclusion zone. Overall decrease of 100 sq.m. in the gross floor area. Minor changes will be made to fenestration and access arrangements. b.Block G: Reduction in the overall building height by 0.8m and reduction of 59 sq.m. gross floor area. To facilitate access to the ESB substation, the formation level will be -1.5m below the current level. Reduction in the number of lifts to 1 no., service risers will be amended, and the roof layout will be revised due to the removal of technical areas. Minor changes will be made to fenestration and access arrangements. c.Block H2: Increase of 181 sq.m. in gross floor area to accommodate ESB substation requirements. Reduction in the overall building height by 0.38m. Changes to roof level plant/structures. Removal of one window on the western façade to improve internal apartment layout. Rearrangement of the main entrance and service area, rearrangement of solar panels, and minor changes to fenestration and access arrangements. d. Block I: Minor reduction in the formation level of the nearby ESB substation to accommodate ESB requirements. Change to the materiality of the ESB substation cladding and minor changes to fenestration and access arrangements. e.Block K: Increase of 14 sq.m. in gross floor area to meet ESB substation requirements. Balcony sizes have been reduced at the southwest, northwest, and northeast corners of the block. Removal of railing on the eighth storey. The overall building height will be reduced by by 2.4m. Minor changes will be made to fenestration and access arrangements, roof layout, plant room layouts, refuse store room, and the loading bay will be relocated from the north side to the east side of the block. f. Block L: Relocation of the block approximately 0.9m eastwards to avoid balconies extending into the ESB exclusion zone, together with minor changes to fenestration and access arrangements. IV. Revision to electric vehicle (EV) charging provision, reducing the proportion of car parking spaces with charging points to 10%. All car parking spaces will be fitted out with electric ducting to allow for future expansion of EV charging points. V.Reconfiguration of bicycle parking spaces associated with Blocks K, H2, I and the playground, including: a.Block K: Two covered spaces north of the block will be relocated to the west side of the block as uncovered spaces. b.Blocks H2 and I: Covered visitor bicycle spaces will be relocated from near Block H2 to under the canopy of Block I. c.Playground: Bicycle parking spaces at the entrance to the playground will be rearranged. VI. Communal open space will be increased by 10 sq.m. and allocated to Block H1, due to the removal of the previously permitted water tank enclosure. VII. All other associated ancillary site works to facilitate the above amendments. | |
| WEB5640/25 | Grant permission | 25 Feb 2026 | 1 | 308 m | 1. Sub-division of existing site. 2. Erection of detached two storey (part single storey) 2 bedroomed dwelling house (71.5 sq.m.) with new driveway and vehicular entrance from public road. 3. Drainage and other associated works. |
| WEB6052/25 | Application declared invalid | 23 Dec 2025 | 426 m | We, InstaVolt Europe Limited, intend to apply for planning permission for development at McDonald’s, Kylemore Rd, Naas Rd, Inchicore, Dublin, D12 P6R6. The development consists of the installation of 2 no. electric vehicle (EV) chargers, ancillary equipment and all associated site development works. | |
| WEB5179/25 | Grant permission | 12 Nov 2025 | 21 | 30 m | We, O’Flynn Construction Co. Unlimited Company intend to apply to Dublin City Council for permission for development at this site, part of the ‘Nissan Site’ (c.1.86 ha), to the east of Walkinstown Avenue at the junction of Walkinstown Avenue and Naas Road. The development will consist of amendments to a previously permitted (Reg. Ref. 3228/20, as amended by Reg. Ref. 3792/23) mixed-use development comprising part Build to Rent development. The development will consist of the following proposed modifications: I. Rationalisation of internal layouts and repurposing of common areas in Blocks I, J, K and L (no change to building heights or footprint), resulting in a total of 416 residential units (from 395 originally) as follows: a) Block I: Rationalisation of ground floor and eighth floor layouts resulting in 6 no. additional units, including 3 no. studio units and 3 no. 2-bedroom units; b) Block J: Rationalisation of ground floor and sixth floor layouts resulting in 3 no. additional units, including 2 no. studio units and 1 no. 2-bedroom unit; c) Block K: Repurposing of internal residential amenity area and adjacent rooftop terrace (external amenity area) at sixth floor level to provide 1 no. additional 3-bedroom unit, and an overall increase of 68 sq.m in the gross floor area (due to repurposing of the sixth-floor rooftop terrace); and d) Block L (Build to Rent): Repurposing of areas formerly designated as tenant amenities and support facilities at ground floor and sixth floor level, and a portion of the external rooftop amenity area at sixth floor level, resulting in 11 no. additional units, including 8 no. 1-bedroom units, 1 no. 2-bedroom unit and 2 no. 3-bedroom units, and an overall increase of 82 sq.m in the gross floor area (due to repurposing of rooftop amenity space). II. Permission is sought to omit the Build-to-Rent (BTR) designation of Block L thereby facilitating occupation by all tenures. III. Elevational changes to Blocks I, J, K and L, as follows: a) Ground-floor elevations of Blocks I, J, and L will be adapted to accommodate the proposed units, replacing curtain walls with windows and doors aligned with the upper-level fenestration, adding terraces, and resizing access openings; b) Upper-level elevations of Blocks I, J, K, and L will be revised, substituting curtain walls for fenestration that mirrors the levels below and incorporating balconies where required; and c) Inclusion of 9 additional terraces at ground-floor level and 67 additional balconies on upper levels (L01-L06) in Block L, ensuring compliance with private amenity space standards for apartment developments, to facilitate the proposed change in residential tenure. IV. Reconfiguration of 2 surface-level parallel car parking spaces and reallocation of public open space to provide 11 standard perpendicular parking bays along the accessway east of Block B, increasing the overall resident parking provision by 9 spaces in total. V. Provision of 32 additional long-stay bicycle storage spaces to serve the new residential units in Blocks I, J, K and L. VI. Communal open space for Blocks I and J (which remains greater than the required quantum) has been reduced to a cumulative total of 4,277 sq.m (from 4,287 sq.m) to facilitate the provision of additional cycle storage for residents. VII. Public open space (which remains greater than the required quantum) has been reduced to a cumulative total of 10,268 sq.m (from 10,389 sq.m) to accommodate 11 reconfigured surface-level car parking spaces as described in IV. VIII. Temporary permission (for the duration of planning permission) is sought for the erection of 2 no. advertising signs at the corner junctions of R112/R810 and R112/110. |
| WEB5475/25 | Application declared invalid | 23 Oct 2025 | 439 m | We, InstaVolt Europe Limited, intend to apply for planning permission for development at McDonald’s, Kylemore Rd, Naas Rd, Inchicore, Dublin, D12 P6R6. The development consists of the installation of 2 no. electric vehicle (EV) chargers, ancillary equipment and all associated site development works. |
Appeals
| ACP case | Type | Outcome | Decided | Distance |
|---|---|---|---|---|
| 324516 | Final Map Appeal | Granted | 18 Nov 2026 | 30 m |
| 324530 | Granted | 18 Nov 2026 | 158 m | |
| 324480 | Disability Certificate | Granted with conditions | 4 Nov 2026 | 307 m |
| 324371 | Referral | open | 15 Jun 2026 | 479 m |
| 323479 | Appeal - LRD | Withdrawn | 28 Nov 2025 | 450 m |
| 323328 | Final Map Appeal | Split | 18 Nov 2025 | 30 m |
| 323338 | Final Map Appeal | Other | 18 Nov 2025 | 158 m |
| 316828 | LA Road Dev - Application | Granted with conditions | 17 Oct 2024 | 159 m |
If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.
What has happened on this file
- 16 Nov 2026 New application · observations close 21 Dec 2026