The development will consist of upgrade works to provide two new signs to the rear of the existing building, 1. above existing rear deliveries entrance and 2. Above existing rear reception entrance. Permission is also sought to provide a glazed canopy over the rear reception entrance and all associated external works.
The five-week window has passed. Late observations are returned unread. If the council has decided, the next door is the appeal window — but under s.37 only the applicant and those who made a valid observation may appeal.
The application
- Reference
- WEB3344/26 · full record
- Authority
- Dublin City Council
- Type
- Permission
- Status
- Registered Application
- Applicant
- not published by the national dataset — see the council register
- Units
- —
- Floor area
- —
- Site area
- —
- Received
- 23 Sept 2026
- We first saw it
- 4 Oct 2026, 23:38
- Decision due
- —
- Decision
- not yet decided
The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.
How to submit an observation
- Read the file on the council register.No register URL is recorded for this reference; search the Dublin City Council planning register for WEB3344/26.
- Write your observation.Quote
WEB3344/26at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Dublin City Council takes it online with the submission or at the counter.
- Submit before 28 Oct 2026.Online through the register above, or in writing to the Planning Department, Dublin City Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
No current zoning polygon covers this site in the store.
Designations on or near the site
- NIAH-recorded building × 32Connolly Station · post office · Old Dubliner Bed & Breakfast
- Radon risk area × 1About 1 in 20 homes in this area is likely to have high radon levels
- OPW flood extent nearby floodinfo.ieShown as a flag only — the OPW licence does not allow us to redistribute the extent.
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| WEB3335/26 | Application declared invalid | 23 Sept 2026 | — | 284 m | CHANGE OF USE: The development will consist/consists of Material change of use of the existing ground-floor unit from dental surgery / health use (Class 8) to retail use (Class 1). |
| WEB2377/26 | Grant retention permission | 27 Jul 2026 | — | 349 m | RETENTION: The development consists of retention of a rooftop solar installation constructed in departure from the details of approved planning application Reg. Ref.: 4220/24. The total solar panel area of the installation is 316.3 sq.m. |
| WEB2706/26 | Application declared invalid | 14 Jul 2026 | — | 279 m | The removal of the existing rear extension and dormer and its replacement with a new 2 storey flat roof rear extension, raising the existing ridge to accommodate the new rear extension, 4no. new rooflights and a privacy screen to rear, and all associated ancillary site and boundary works. |
| WEB2231/26 | Grant permission | 10 Jul 2026 | — | 449 m | PROTECTED STRUCTURE: (i) Carry out brick mortar repairs to badly spalled brickwork; (ii) Treatment and steam clean front parapet capping, granite window cills, brick facade and entrance steps in order to remove algae and carbon and/or paint; (iii) Granite plinth, dividing wall capping and granite string course – paint to be removed and surface to be treated and steamed clean. Joints to be raked out and repointed using natural hydraulic lime in a flush joint; and (iv) Lower Ground Floor, paint finish to be removed and wall finish to be lime plastered using natural hydraulic lime in a lined & ruled finish. |
| WEB1480/26 | Refuse permission | 4 Jun 2026 | — | 15 m | PROTECTED STRUCTURE RPS Ref No. 103 : (i) a change of use from 11 no. residential apartments to residential apartments, where care is provided to minors; (ii) change of use of 2 no. ground floor commercial units to ancillary staff offices and meeting rooms to serve the facility; (iii) all other works necessary to complete the development.' |
| WEB1674/26 | Grant permission | 14 May 2026 | — | 309 m | The St. Laurence O'Toole Catholic Social Care CLG, trading as Crosscare, wish to apply for Planning Permission for 2 single storey extensions to the front of the existing Community Café & Food Bank, which will consist of: (1) a 33sqm extension to the west corner of the building adjacent to No 36 Portland Row to provide new care workers' offices, with a new entrance from Portland Row with three new roof lights. (2) The construction of a 54.3sqm extension to the corner of Portland Row & Dunne St. providing a new dining hall and entrance lobby. (3) The removal of existing vehicular access, minor alterations to the remaining elevations and internal areas, relocation of the bin storage area, and all associated site works, including the provision of new metal railings to the footpath boundary at 35 Portland Row, Dublin 1, D01 T102. |
| WEB2832/25 | Grant permission | 14 May 2026 | — | 132 m | PROTECTED STRUCTURE: Full refurbishment and repair works to the existing Connolly Headquarters Building located adjacent the existing Connolly Railway Station, at Amiens Street, Dublin 1. This is a protected structure. Proposed works include the demolition of an existing small modern extension to the north; installation of a new passenger lift with associated structural alterations; stripping-out of modern alterations to reinstate the former lightwell; reconfiguration of internal layout; general services upgrade throughout; and fabric repairs generally, including roof and external finishes. |
| WEB1436/26 | Additional information | 20 Apr 2026 | — | 376 m | PROTECTED STRUCTURE/ RETENTION/PERMISSION : I/WE Conbak Properties LTD INTEND TO APPLY FOR { X } PERMISSION { X } RETENTION PERMISSOIN For development at this site 66 Summerhill, Dublin 1, D01 T211 (a Protected Structure RPS 7865) . The development will consist/consists of (A) retention of refurbishment works to existing bathrooms at first, second and third floor levels; and (B) retention and removal of the unauthorised installation of aluminium windows at first, second and third floor levels and permission for the installation of hardwood Georgian style sash windows at first , second and third floor levels and all associated ancillary site works. |
Appeals
| ACP case | Type | Outcome | Decided | Distance |
|---|---|---|---|---|
| 501478 | Planning Appeal | Split | 6 Oct 2026 | 309 m |
| 501319 | Planning Appeal | Granted | 2 Sept 2026 | 241 m |
| 500887 | Planning Appeal | Granted with conditions | 13 Aug 2026 | 426 m |
| 500535 | Planning Appeal | Refused | 29 Jul 2026 | 256 m |
| 501632 | Planning Appeal | open | 1 Jul 2026 | 15 m |
| 322780 | Planning Appeal | Refused | 9 Oct 2025 | 483 m |
| 321693 | Planning Appeal | Refused | 14 May 2025 | 292 m |
| 320536 | Planning Appeal | Granted with conditions | 10 Mar 2025 | 258 m |
If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.
What has happened on this file
- 23 Sept 2026 New application · observations close 28 Oct 2026
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 4 Oct 2026, 23:38. Not legal advice — confirm the deadline with Dublin City Council before relying on it.