26 Hanbury Lane, Dublin 8

We, Belmurt Limited, intend to apply for planning permission for development at 26 Hanbury Lane, Dublin 8. The application site is located to the rear of properties fronting Hanbury Lane to the north and Earl Street South to the south, with access to the application site from both Hanbury Lane and Earl Street South. It is bounded by the properties along Thomas Court to the west and St. Thomas Abbey Gardens Allotments to the east. The proposed development will consist of the following: • Change of use of the existing training centre to a sports facility, including gym use (Class 11); • Provision of additional floor space at ground floor level (90 sq.m) with a void at first floor level via infilling an existing internal courtyard and associated alterations at roof level, resulting in a total GFA of 1,210 sq.m; • Associated internal alterations and reconfiguration of the building to accommodate gym and fitness studios, changing rooms, showers and ancillary facilities, and provide for a secure bicycle parking area at ground-floor level comprising 24 no. cycle parking spaces; • Minor alterations to provide for new signage on the northern and southern elevations, and the existing gates fronting Earl Street South; and • All associated and ancillary site development works

Observations close 16 Dec 2026 24 days left
5 weeks from receipt (received 11 Nov 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20

The application

Reference
WEB3756/26 · full record
Authority
Dublin City Council
Type
Permission
Status
Registered Application
Applicant
Belmurt Limited
Received
11 Nov 2026

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at https://planning.agileapplications.ie/dublincity/application-details/?ref=WEB3756%2F26.
  2. Write your observation.Quote WEB3756/26 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Dublin City Council takes it online with the submission or at the counter.
  4. Submit before 16 Dec 2026.Online through the register above, or in writing to the Planning Department, Dublin City Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

Designations on or near the site within 100 m

  • NIAH-recorded building × 14
    building misc · Ladbrokes · Ladbrokes
  • Radon risk area × 1
    About 1 in 20 homes in this area is likely to have high radon levels
  • Recorded monument × 14
    Religious house - Augustinian canons · Church · Prison

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
WEB3265/26Further information5 Nov 2026142 mThe development will consists of: 1) Construction of a 19.2m² rear extension at first floor level and a 19.2m² rear extension to second-floor level incorporating a flat roof, together with the provision of two balconies, each measuring 6.8m². 2) Change of use of the proposed first and second floor office accommodation to provide three residential apartment units, comprising: One studio apartment; One 2-bed 3-person apartment; and One 2-bed 3-person duplex apartment. 3) Construction of an additional 68.1m² rear extension at first-floor level to provide one additional two-bed 3-person apartment, together with a green roof, associated landscaping, and all ancillary works. 4) The reconfiguration of the existing ground floor retail unit, including the provision of a bin store and bicycle store, together with all associated site development and ancillary works.
WEB3266/26Grant permission5 Nov 2026424 mThe proposed development comprises an amendment to planning permission granted under Reg. Ref.: WEB2472/24. The amendments relate solely to the permitted Utilities Hub which is located to the south of the brewery site, close to James’s Street. The amended Utilities Hub will comprise a two-storey (split level) mechanical and electrical plant room building containing a Heat Pump Room, 10 KV Intake, Pump House and LV Rooms with a primary parapet height of 9.25m above upper ground level (22.25m O.D) including external (screened) electrical transformer equipment and 3 no. external vessels to a height of c. 15m above lower ground level (22.75m O.D.), demolition of an existing external staircase and the construction of 2 no. external staircases. The overall GFA of the Utilities Hub Building is c. 594m2. A blue roof (for rainwater attenuation) is proposed at both roof levels. The proposals comprise a reserved area for the provision of electrical infrastructure which will be subject to an application to An Coimisiún Pleanála as it comprises Strategic Infrastructure Development. The proposed development includes associated site development works including hard and soft landscaping and the extension of new site services routes (both underground and above ground) including ancillary pipe racks, providing electrical and utilities infrastructure, above and below ground drainage. 26 no. covered bicycle parking spaces are proposed. The proposal is located within a site which has an approved IE (Industrial Emissions) Licence (Ref: P0301-04). ______________________________________________________________________________
WEB3575/26Application declared invalid21 Oct 2026146 mPermission to remove the existing 5 globe shaped shrouds covering the existin antennae and communication dish (antennae and communication dish to remain in situ) on the existing 20-metre-high freestanding telecommunications structure.
WEB3510/26Application declared invalid15 Oct 2026403 mThe construction of (a) Erection of new building signage comprising of brushed stainless-steel individual lettering, fixed directly to the existing brick work wall with concealed fixings mounted on the front (East) elevation and side (North) elevation. (b) No internal alterations are proposed, and the existing internal floor plans will remain unchanged. (C) all associated site works.
WEB3101/26Application declared invalid1 Sept 2026297 mCHANGE OF USE: The development will consists of: 1) Construction of a 19.2m² rear extension at first floor level and a 19.2m² rear extension to second floor level incorporating a flat roof, together with the provision of two balconies, each measuring 6.8m². 2) Change of use of the proposed first and second floor office accommodation to provide three residential apartment units, comprising: One studio apartment; One 2-bed 3-person apartment; and One 2-bed 3-person duplex apartment. 3) Construction of an additional 68.1m² rear extension at first-floor level to provide one additional two-bed 3-person apartment, together with a green roof, associated landscaping, and all ancillary works. 4) The reconfiguration of the existing ground floor retail unit, including the provision of a bin store and bicycle store, together with all associated site development and ancillary works.
WEB2000/26Grant permission29 Jul 2026438 mThe development seeking permission will consist of the construction of a single storey structure to the rear garden, for home office use.
WEB2243/26Additional information10 Jul 202614464 mWe, Black Sheep Investments Limited, intend to apply for Permission for development at this site: 1-2 Chamber Street, at the junction with Ardee Street and Chamber Street, Dublin 8, D08 H3K5. The development will consists of: (i) Demolition of non-original extension of the existing public house, the Ardee House; (ii) Part-demolition of the existing original fabric of public house structure, with the selective retention of external façades; (iii) Construction of a part six-storey mixed-use development to contain: (a) 14 no. Apartments (4 no. Studios and 10 no. 1-bed units), (b) Community Facility (30 sqm) at ground level, (c) Bike and Bin store at ground level, and (d) Communal Amenity Space (75 sqm) at terrace at Fifth floor; and (iv) All associated site works.
WEB1019/26Grant permission25 Jun 202627499 mThe development consists of the construction of an apartment building ranging in height from 3 storey to 4 storey which is to be constructed over the existing basement block which is in-situ and which was constructed pursuant to permission 5588/03. The development incorporates 27no. apartment units of which there are 7no. studio apartment, 17no. 1bed apartments and 3no. 2bed apartments along with associated residential communal spaces at ground level. Provision is also made for a ESB substation at ground level within the building. The proposal also incorporates provision of bin and bicycle storage, plant rooms, storage rooms at basement level which are to be accessed via a lift and stair cores. Associated boundary treatments, external landscaping, connection to existing site services and all ancillary development works.

Appeals

ACP caseTypeOutcomeDecidedDistance
501388Planning AppealRefused21 Sept 2026462 m
501390Planning AppealGranted18 Sept 2026193 m
500351Planning AppealGranted2 Jun 2026241 m
324129Referralpending9 Mar 2026143 m
321007Planning AppealRefused21 Aug 2025193 m
321430Planning AppealRefused4 Jul 2025411 m
321276Planning AppealRefused25 Mar 2025425 m
320481Planning AppealGranted with conditions18 Feb 2025137 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 11 Nov 2026 New application · observations close 16 Dec 2026