PlanningRegister.ie
Observation pack · Dublin City Council

20, Gordon Street, Dublin 4

Amendments to the scheme for the extension and alteration of the existing house, granted permission under Register Ref: WEB5687/25, to a) Increase the height of the Dormer Parapet by 150mm and b) Change the colour of the exterior doors and windows from RAL 7016 (Anthracite Grey) to RAL 7021 (Black Grey)

Observations close 4 Jan 2027 37 days left
5 weeks from receipt (received 19 Nov 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20

The application

Reference
WEB3840/26 · full record
Authority
Dublin City Council
Type
Permission
Status
Registered Application
Received
19 Nov 2026

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at https://planning.agileapplications.ie/dublincity/application-details/?ref=WEB3840%2F26.
  2. Write your observation.Quote WEB3840/26 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Dublin City Council takes it online with the submission or at the counter.
  4. Submit before 4 Jan 2027.Online through the register above, or in writing to the Planning Department, Dublin City Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

Designations on or near the site within 100 m

  • Radon risk area × 1
    About 1 in 20 homes in this area is likely to have high radon levels
  • OPW flood extent nearby floodinfo.ie
    Shown as a flag only — the OPW licence does not allow us to redistribute the extent.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedDistanceDescription
WEB3279/26Further information5 Nov 2026437 mThe development will consist of the construction of a single storey external bicycle store (57 no. spaces) adjacent to the northern elevation to facilitate the relocation of permitted bicycle storage at basement level of the Treasury Annex, with bin storage and minor reconfiguration to changing facilities provided at basement level. The number of permitted bicycle parking spaces (313 no.) under Reg. Ref.: 2860/21 (as amended) and Reg. Ref.: 3965/20 (as amended) remains unchanged.
WEB3170/26Grant permission27 Oct 2026483 mConstruction of a 5.4 sqm pitched roof extension to rear at first floor and all associated internal and external alterations.
WEBDSDZ3485/26Application declared invalid12 Oct 2026446 mPlanning Permission for the provision of an outdoor seating area to the front of Cool Hand Coffee Roasters, Hanover Quay, Grand Canal Dock, Dublin D04 H7W2. Works to include the provision of 6no. tables and 12no. chairs, movable barrier awnings / windbreakers and new a retractable awning fitted to existing shopfront. The premises is located within the North Lotts and Grand Canal Dock Strategic Development Zone (SDZ).
WEB2978/26Grant permission2 Oct 2026323 mErection of an illuminated corporate sign measuring 9.9m wide x 1.5m high at ninth floor level on the northern elevation of No. 2 Grand Canal Quay, Dublin 2.
WEB3248/26Application declared invalid14 Sept 2026437 mWe, Google Ireland (Limited), intend to apply for permission for development at this site at The Treasury Building and Treasury Annex, Grand Canal Street Lower and Macken Street, Dublin 2. The development will consist of the construction of a single storey external bicycle store (57 no. spaces) adjacent to the northern elevation to facilitate the relocation of permitted bicycle storage at basement level of the Treasury Annex, with bin storage and minor reconfiguration to changing facilities provided at basement level. The number of permitted bicycle parking spaces (313 no.) under Reg. Ref.: 2860/21 (as amended) and Reg. Ref.: 3965/20 (as amended) remains unchanged.
WEB2964/26Application declared invalid12 Aug 2026323 mErection of an illuminated corporate sign measuring 9.9m wide x 1.5m high at ninth floor level on the northern elevation of No. 2 Grand Canal Quay, Dublin 2.
WEB2828/26Application declared invalid28 Jul 2026113 m1. Demolition of existing 15 sq.m.single storey Kitchen and Wet Room extension and 2.49 sq.m. outhouse to the rear. 2. Construction of 12 sq.m. Ground Floor extension and a 25.5 sq.m. First Floor extension with flat roof to the rear of existing terraced house. 3. Replacement windows and entrance door to the front elevation of the house. 4. Associated works.
WEB2321/26Grant permission23 Jul 2026481 mPROTECTED STRUCTURE: The fitting of Solar panels to the front, rear and valley and hip slopes of the main double pitched roof and valley of the two-storey and single-storey Returns; the following works to the front façade: cleaning the render, cleaning the granite steps, string course and coping stones and repainting painted patent cement reveals and granite cills to windows to this three storey over garden level residential building at 13 Northumberland Road, Ballsbridge, Dublin 4, D04 X243 by Riverwalk Estates Limited. This is a Protected Structure.

Appeals

ACP caseTypeOutcomeDecidedDistance
501913Planning Appealpending14 Aug 2026406 m
501880Planning Appealpending12 Aug 2026413 m
501839Planning Appealpending5 Aug 202645 m
501030Planning AppealGranted16 Jul 2026369 m
323711Planning AppealRefused18 Dec 2025268 m
323509Planning AppealGranted with conditions1 Dec 2025482 m
322082Fire Safety Certificate - RevisedGranted with conditions8 Oct 2025303 m
322659Planning AppealGranted with conditions1 Oct 2025465 m

If neighbours here have appealed before and lost, the inspector's report on that case is the single most useful thing to read.

What has happened on this file

  • 19 Nov 2026 New application · observations close 4 Jan 2027

Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 28 Nov 2026, 00:12. Not legal advice — confirm the deadline with Dublin City Council before relying on it.